Providing And Laying G-Iii, Built-Up-Spray Grout, Tack Coat, Bitumenious Concrete 25Mm Thick And Thermoplastic Strip In Km. 12/00 To 13/00, 13/00 To 14/00, 14/00 To 15/00 And 15/00 To 16/00. Restoration Of Rain Damages On Padhar Balh Road Km. 0/00 To 18/500. Pdna -2023