1S&T Work In Connection With Proposal For Construction Of Rub In Lieu Of Lc No.10 At Km 15/27-29 Between Nambur And Mangalagiri Stations. 2Proposed Construction Of Rub In Lieu Of Lc No. 268 At Km 73/1-2 Between Savalyapuram- Vinukonda Stations. 3Telecom Arrangements In Connection With Proposal For Construction Of Rub In Lieu Of Lc No.07 At Km 10/5-6 Between Nallapadu - Bandarupalli Stations. 4 S&T Work In Connection With Provision Of Subway At With Manned Lc.No:16@Vlg In Guntur Division. 5 S&T Work In Connection With Rebuilding Of 2 Lane Rob With 3 Lane Rob At Rly Km 20/2-3 On Chilakaluripet - Vijayawada Section Of Nh 16 At Km 406+300 Between Vejandla - Manipuram Cabin Stations Of Tenali - Guntur Section In Guntur Division.