The Work Includes Clearing Vegetation, Mobilization, Setting Up Boring, Boring With Rotary Power Drilling Equipment For Strata Upto 10M, 10-20M, 20M-30 M, Above 30, Boring Through Rock, Recovering Disturbed Samples, Compilation Of All Field Data Etc General-Budget Work 2023-2024- Govt. Taluk Hospital, N Paravur-Soil Investigation Work-General Civil Work