Excavation For Structures Earthwork In Excavation For Structures As Per Drawing And Morth Specifications Clause 304.1 Including Setting Out, Construction Of Shoring And Bracing, Removal Of Stumps And Other Deleterious Material And Disposal Upto A Lead Of 50 M, Dressing Of Sides And Bottom And Backfilling In Trenches With Excavated Suitable Material. Ordinary Soil Upto 3 M Depth Bindrada To Chainpuria Via Rampuria