Gem Bids For Consultancy, Preliminary Site Visit Data Collection Mobilization Ofinstrument At Location And Preparation Of Report For Eachbuilding, Testing Work As Per The Standard Method For Thebelow Mentioned Rates, Compressive Strength, Specificgravity, Water Absorption, Weathering, Load Test Onstone Slab