Construction Of H.l. Bridge Over Jodamunda Nallah At 6th Km On Bilaspur To Damapali Road Under Sby For The Year 2024-25
Sampling Blister Internal Piping And Las Installation Of Block-102A And 110 At Inrpc, Barc, Tarapur
Carry Out Balance Works Of Construction Of Two Covered Storage Sheds Inside The Wharf Through Risk And Cost Civil Works Carry Out Balance Works Of Construction Of Two Covered Storage Sheds Inside The Wharf Through Risk And Cost -Civil Works
Repair/ Rehabilitation/ Overhauling Of 1000Lpm Elgi Make Compressors For Generating Spares For Ioh And Toh Of Electric Locomotives
Procurement Of Works S/s Increasing Capacity Of 132kv Gis S/s Bsr-ii
Proof Of Concept Poc Of 5g Indigenous Networking Solution In Mathura-chata Section31rkm Of North Central Railway For Development Of 5g Eco-system On Indian Railways With Indian Vendors For Voice, Data, Mcx Capability In 5g Technology
Rajkot Division:- Improvement To Road Surface By Providing Rubberized Surface At 24 Nos 12+12 Nos Lcs Between Rajkot - Kanalus Against Various Sanctions.
Bhopal Division: Increase Of Csr Of Loop Lines At Various Stations I.E. Rtws, Srki, Pai, Dwg, Mso, Odg & Drhi Including Outdoor & Indoor Alteration Work In Ei/Pi.
Aden/S/Mdus Sub-Division - A Construction Of Rcc Oht Of 90000 Lit Capacity -3 Nos At Vpt & 1 No. At Rjpm With Pipeline Arrangements In Lieu Of Exg. Corroded Steel Ohts, B Augmentation Of Water Supply At Tdn, Tmq, Vpt, Srt, Svks, Svpr & Rjpm Stations.
Amc For Three Years Of 2X 48 Fiber Ofc Up And Dn & Towers In Mtj-Nad Section Of Kota Divisionwcr