R And R Of Side And Bottom Rubber Seals Of Barrage Gate And Stoney Gate Of Head Works Barot
Construction Of New Ht Line, Sub Station Along With Lt Line For Power Supply To Kusumi Barrage Gate Operation For The Year 2025-26.
Renovation Of Brahmani Barrage Gate Through Change Of Rubber Seal, Bearing, Guide Roller, Through......of Brahmani Barrage At Baidhara, Block-rampurhat-1, Dist-birbhum. Wbiw/se/swmec/nit-02e/25-26
Renovation Of Brahmani Barrage Gate Through Change Of Rubber Seal, Bearing, Guide Roller, Through......of Brahmani Barrage At Baidhara, Block-rampurhat-1, Dist-birbhum. Wbiw/se/swmec/nit-02e/25-26
Repairing And Painting Of Top And Bottom Horizontal Girder Along With Change Of Rubber Seal Of Mahanadi Barrage Spillway Gate No 13 And 26 For The Year 2025 2026
Gate Operation Of Silabati Barrage And Ch. 234.00 Cr At Ramchandrapur For 6 Six Months For Khariff Rabi Watering Of K.c.sub-division No-v Under K.c Division No- Ii Khatra During F.y.2025-26 Wbiw/ee/kcd2/enit-02/2025-26 Sl No-16
Supplying Man Power For Operating Vertical Leaf Gate For Sulwade Barrage Med Project Tal Shindkheda
Overhauling Of Main Roller Of Gate At Narora Barrage
Construction Of New Ht Line, Sub Station Along With Lt Line For Power Supply To Kusumi Barrage Gate Operation At Sunalati, For The Year 2025-26.
Repairing And Painting Of Top Middle And Bottom Horizontal Girder Along With Change Of Rubber Seal Of Birupa Barrage Spillway Gate No 08 And Under Sluice Gate No 03 For The Year 2025 2026