Supply, Installation Testing And Commissioning Of Omega Make Elevator/Lift Or Comprehensive Annual Maintenance Contract Of Omega Elevators Comprehensive Annual Maintenance Contract For The Passenger Lifts Of Administrative Block And Library Building At Csir-Crri, New Delhi-110025
Annual Maintenance Contract Amc Of Kone Make Elevator Lift Installed In Boiler Unit 1 Goods Elevatorslift Boiler Unit No 2 Goods Elevatorslift, Passengers Elevatorlift In Boiler Unit 1, Passenger Boiler Elevatorlift Unit 2, Tg Building.
Gem Bids For Supply, Installation, Testing & Commissioning Ofpassenger Elevator Lift
Gem Bids For Custom Bid For Services - Sitc Of New Lift/elevatoralong With Compehensive Amc For 3 Years Afterdefect Liability Period Of 1 Year Includingdismantling Of Existing Lift / Elevator At Statebank Of India, Rbo Gaya Building, Gaya, Bihar
Gem Bids For Capsule Type Elevator/lift
Providing And Installation Of Lift Elevator 10 Passenger At Zone-A Building Mc, Ludhiana Including Construction Of R.C.C Duct.
Comprehensive Maintenance Contract Of Two Nos, Passenger-cum-bed Lift (make - "thyssenkrupp Elevator ) At Indoor Block And Emergency Block Of Howrah Orthopaedic Hospital For 60 Months.
Annual Comprehensive Maintenance Contract Of Passenger Lift Elevator Make Kone For 53 Nos. Lift Existing Slbsgmc And H Complex At Nerchowk In Distt. Mandi Hp For The Period One Year Annual Comprehensive Maintenance Contract Of Passenger Lift Elevator Make Kone For 53 Nos. Lift Existing Slbsgmc And H Complex At Nerchowk In Distt Mandi Hp For The Period One Year
Provn Of Pneumatic/Hydraulic Traction Lift Elevator Of G Plus 1 At Outside Bldg No O-6 Alongwith Associated Civil Works And Electric Supply Inside Vijay Durg Under Ge Fw Kolkata
Elappully Gramma Panchayath - Project No. 315/26 - Installation Of Lift And Additional Facilities At Grameena Padanakendram-Supply And Installation Of Elevator-Electrical Lift Work