Removal Of Formation Deficiency In B/w Km. 2/640 To 2/680, Removal Of Land Slide At Rd. 2/500 To 2/580, C/o Rcc Hume Pipe Culvert At Rd. 2/640 And 3/200, Wire Crate Work At Rd. 2/500 To 2/560 And 2/645 To 2/680 And U-shape Drain At Rd 2/500 To 2/580