Supply Of Procurement Of Vesda Compact Laser Detector Vlf Etc..
Gem Bids For Dual Brake Valve , Brake Shoe Linner , Wheel Bearing Front , Pressure Plate , Nozzle , Radiator Assy , Air Pressure Pipe , Rear Brake Hose , Assy Cable Set , Rubber Hose
Gem Bids For Manpower Outsourcing Services - Minimum Wage - Unskilled; Not Required; Admin Cleaning Sanitation And Disinfection Service - Outcome Based - Officecommercialinstitutionsresidential; General Cleaning Sweeping Mopping Dusting; Indoor
Gem Bids For 6 Led Luminaire For Floodlight V2 Conforming To Is 10322 Part 5section 5 Q3
Gem Bids For Custom Bid For Services - Providing Expert Services For Preventive & Breakdown Maintenance Of Siemens Make Mv Soft Starters Hcu Mug At Bpcl Bina Refinery
Gem Bids Forlv1-r72_ost.3.408.70_10253473_clip Frame , Lv1- R72_gost503.81_band_clip Pin , Lv1-r72_cqa-hv- 5.51.001_seal And Spring Set , Lv1- R72_172.52.093_ring Packing , Lv1- R72_176.31.057.1_paacking , Lv1- R72_172.70.066sb_hose , Lv1-r72_175-52-056_ring Packing , Lv1-r72_41.50a_rubber Cover Gun Muzzle , Lv1-r72_432.66.142_ring Packing , Lv1-r72_175-40- 010_ring Packing , Lv1-r72_tu16-535-853-79
Supply of F1_5110-000289_SAW BLADE , G1_NK001430_CUTTING BLADE BIG , H1_NK001430_EMERY PAPER , H1_NK000809_ANABOND , X3_MISC-367260005_AVR , X3_NK000766_FUEL PIPE , H1_8010-000128_THINNER ANTICHIL , H1_NK001199_SR-998 , H1_NK000844_THREAD TAPE , H1_5970-000576_TAPE INSULATION , H1_NK001464_BUBBLES PAPER , H1_NK001465_9 V BTY LITHIUM , H1_CHD-NIV2000-00019_M SEAL , H1_8305- 000082_LEATHER CLOTH BLACK
asdasdas
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Dismantling of structurals tanks machineries Equipments at all levels and at either of the plants 25 ton as per scope of work; as per scope of work , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Structural fabrication and thereafter painting of structurals at either of the plants 50 ton as per scope of work; as per scope of work , Repair, Maintenance, and Installation of Plant /system /Equipments (Version 2) - Industry Unit; Erection of structurals equipments at all levels and at either of the plants 50 ton as per scope of work; as per scope of work , Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Pipe line fabrication modification and replacement with oldnew pipe upto 380 NB at either of the plants 200 meter as per scope of work; as per scope of wo.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Rubber lining works The rubber lining is to be done by cold vulcanization work and lined with new rubber sheet old conveyor belt 50 square meter as per s.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Supplying providing and fixing of GI Roof sheet work 250 square meter as per scope of work; as per scope of work
Supply of Single Cot With Locker Including Mosquito Net Frame: Cot Frame Of Size 75 X 30 Fabricated W Ith 18 Swg Cr Sheet Thickness, Cot To Have 3 Stiffeners Of Size 72 X 3 Of 16 Swg Thickness. Ear Piece Of Cot Fabri Cated With 10 Swg Plate, Legs Fabricated With 1.5 Sq.Pipe, Pipe Of 16 Swg Thickness. With Cot Locker Of Size 2.5 L X 18 B X 15 H To Fixed At The Bottom Of The Cot Frame. Cot To Have Mosquito Frames. Warranty .3 Year. W Arranty Period: 36 Months After The Date Of Delivery