Repair And Rehabilitation Work Of Expansion Joint, Wearing Course, Profile Correction Etc. Of Chiraiyatand Flyover And Kankarbagh Flyover Under In The District Of Patna, Biha R.
Construction Of High Level Rcc Bridge 5X21.00 Of Jamalpur G.N. Bund To Jhowabahiyar-Harinmar-Athrahiya-Gogri Bund Road Chainage : 3100- 3300
Construction Of H.L. Rcc Bridge Between Khaira Paschim Tatbandh And Bhaduar Gh At Purvi Tatbandh Over Kamla Balan River In Jhanjharpur Block Of Madhubani District
Construction Of Rob Of Span (1 X 63.480 M + 18 X 18.600 M + 9 X 10.00 M) With Appro Ach, (viaduct & Re Wall) Service Road And Drain In Lieu Of L.c. No.-71a On Patna- Gaya Road (ramshila More To Gaya Railway Station), Mdr, Between Station Gaya- Manpur At Rly. Km.-468/16-18
Construction Of Rob And Its Approaches In Between Saharsa & Panchgachiya Railway In L.C. No-31 Spl. Class Bangali Bazar To Purab Bazar Road
Construction & Re-Setting/Rearrainging Of New Pontoon Bridge & Resetting Of 65 Pontoon Sets, Jetty, Approach Road And Maintenance For The 5 Financial Year I.E F.Y 2026-27 To 2030- 31 Of Pontoon Bridge From The Alignment And Storing The Pontoon Set At Safe Place On T He Side Of Ganga River Embankment Between Pattharghat And Hardashpur Village In Sa Mastipur District During Rainy Season And Watching The Pontoon Sets Safety Anchored Alo Ng The River Embankment During Rainy Season For Six Month As Well As Rearranging The Pontoon Sets When Ever Required Due To Increasing And Decreasing Of Water Level.
Construction Of Rob In Between Railway Station Baruniteghra L.C. No. 7B
Construction Of Rob In Lieu Of Lc No- 61Spl At Km- 177/17-19 Between Baraunibegusarai Stations At Road Km0.200 Of Mrd Between Bju To Zero Mile
Construction Of Connectivity Road Of Janeshwar Mishra Setu Across River Ganga From N H-84 At Ch:91+810 Buxar, Bihar To Nh19 Balia, U.P On Epc Mode In District Buxar, Bihar
Construction Of H.L. R.C.C. Bridge 12X24.00M At Ibrahimpur Ghat Under Mehasi Blo Ck