Request For Selection (rfs) (single Bid Two Envelope System) From Technical Capable And Financial Sound Positioned Bidders For Setting Up Of Total 125 Mw/500 Mwh Standalone Battery Energy Storage System (bess) Under
Procurement Of 20 Mw (ac) Of Solar Power Through Tariff-based Competitive Bidding From Grid-connected Canal-bank Solar Pv Power Project To Be Constructed Under Resco Mode At 05 (five) Different Locations In The State Of Bihar
Selection Of Epc Contractor For Survey, Design, Engineering, Supply, Procurement, Installation, Erection, Construction & Commissioning Of Grid Connected 116 Mw (ac) Solar Pv Along With 50.5 Mw For 4 Hour (min. 241 Mwh) Battery Energy Storage System Power Plant On Epc Basis
Procurement Of 20 Mw (ac) Of Solar Power Through Tariff-based Competitive Bidding From Grid-connected Canal-bank Solar Pv Power Project To Be Constructed Under Resco Mode At 05 (five) Different Locations
Construction Of Boundary Wall For Project Site Of Thermal Power Project Near Village Pirpainti
Setting Up Of Total 125 Mw/500 Mwh Standalone Battery Energy Storage System (bess) Under Tariff Based Competitive Bidding (tbcb) With Support Of Viability Gap Funding (vgf) Under Build-own-operate-transfer (boot) Model In The State Of Bihar At Different Grid Sub -stations Of Bihar State Power Transmission Company Limited
Barbed Wire Fencing Work From Main Entrance Gate To Taali Pahadi Gate (near Block 14) At 185 Mw +254 Mwh Bess Solar Power Project
Setting Up Of 500 Mwh Standalone Battery Energy Storage Systems Bess Under Tariff Based Competitive Bidding Tbcb In The State Of Bihar Under Bihar State Power Gen Eration Company Limited Bspgcl With Viability Gap Funding Vgf Support Under ?Boot? Mode.
Gem Bids For High End Desktop Computer Q2, High End Laptop -notebook Q2, Multifunction Machine Mfm V2 Q2, Lineinteractive Ups With Avr V2 Q2
Selection Of Epc Contractor For Survey, Design, Engineering, Supply, Procurement, Installation, Erection, Construction & Commissioning Of Grid Connected 116 Mw Ac Solar Pv Along With 50.5 Mw For 4 Hour Min. 241 Mwh Battery Energy Storage System Power Plant On Epc Basis With 10 Years Operation And Maintenance At Kajra, Bihar, India