Beautification Of Green Belt Of C-block Of Madhuban-bapudham Yojna, Planting Of 379 Saplings, Installation Of Submersible Tubewell And Water Line For Grass Irrigation And Barbed Wire Fencing With Rcc Poles For Security.
Construction Work Of Sewer, Drainage And Road, 18.00 Mt Wide Zonal Road No. D-2 From Main Bandha Road To Noornagar, Rajnagar Extension.
Horticulture Development And Garden Maintenance Work For A Period Of Two Years On The Land Freed From Illegal Encroachment Of National Highway-24 To Greater Noida Link Road.
Horticulture Maintenance Work Of The Park Developed In Chandrashila Apartment Nehru Nagar-2 For A Period Of Two Years.
Repair And Painting Work Of Parks Constructed Under Pocket B Of Madhuban Bapudham Scheme.
External Electrification Work For The Newly Created 16 Commercial Plots Behind Group Housing Plot No. 4 In The Koyal Enclave Residential Scheme.
The Work Of Shifting The 33 Kv Line Passing Over The Plots In Pocket-c Of The Madhuban Bapudham Scheme.
Cleaning Of Roads And Drains With Disposal Of Garbage And Silt Dewatering By Pump At Tulsi Niketan Scheme.
Request For Proposal For Selection Of Consultant For Revision Of The Detailed Project Report (dpr) As Per The Revised Layout Of The Madhuban Bapudham Scheme
Construction Work Of 45.00 Mt Wide Road, Sewer And Drainage System In Village Sikrod, Rajnagar Extension.