Construction Of 05Five Nos. Of Rrhs Structure On Different Govt. Building Under Sonepur Ulb Of Subarnapur District Under Chhata Scheme
Construction Of 04Four Nos. Of Rrhs In Bhadrak Block Of Bhadrak District Under Chhata Scheme For The Fy 2025-26
Construction Of 06Six Nos. Of Recharge Shaft In Different Existing Tanks/Ponds In Sonepur Block Of Subarnapur District Under Arua Scheme
Construction Of 05Five Nos. Of Recharge Shaft In Different Existing Tanks/Ponds In Loisingha Block Of Bolangir District Under Arua Scheme
Analytical Laboratory Instruments
Heating And Temperature Control Laboratory Instruments
Manpower Outsourcing Services
Laboratory Instruments
Construction Of 05Five Nos. Of Recharge Shaft In Different Existing Tanks/Ponds In Bargarh Block Of Bargarh District Under Arua Scheme
Construction Of 02Two Nos Of Rrhs In Bhandaripokhari Block Of Bhadrak District Under Chhata Scheme For The Fy 2025-26