I Remodeling Of Existing Old Aged Damaged 200mm Dia Sewerage Sewer Line With 300mm Dia Sewerage Sewer Line From H.no.2-22-9/a/1 To 2-21-113/8, Hanuman Temple Road And Ii Remodeling Of Existing Old Aged Damaged 200mm Dia Sewerage Sewer Line With 300mm Dia Sewerage Sewer Line At From H.no.2-20-9-13/1 To 2-20-9/21, Kepal Katla Dawakana Galli And Iii Remodeling Of Existing Old Aged Damaged Sewerage Sewer Line With 300mm Dia Sewerage Line At Chilkanagar Near Boddurai Road From H.no.2-21-96/nr To 2-21-96/ In Ward No.7 Chilka Nagar Under Uppal Section, Sd-ii, O And M Divn.no.xiv, Uppal
Manning And Operation Of Revenue Billing And Collection Manpower, Services For A Period Of 01 One Year Under O And M Divisions Ix And Xvii Of O And M Circle-iv.
Laying Of 250mm Dia Di Water Supply Line To Provide Water Supply Connection To United Avenues Varada Rama Krishna Rao Under Manikonda Section Sd-i, O And M Div-xviii Vide File No. 2024-10-1133reserved For Sc Community As Per Go Ms.no:59
Supply And Delivery Of Epos Machine Thermal Rolls With 60gsm And 20mtrs Length And Width 57mm Suitable For Existing Hmwssb Epos Machines Under The Jurisdiction Of Hmwssb.
Laying Of 150mm Dia Di Main Pipeline To Provide Water Supply Connection To Venkata Gajanana Developers Rep By Sri. A. Srinivas Reddy And Others At Bank Colony, Under Kompally Section Sd-i, O And M Div-xxi Vide File No. 2025-3-3180reserved For St Community As Per Go Ms.no:59, Dt:21.05.2018
Providing Water Supply Infrastructure By Replacement Of Pipeline Under Turkayamjal Section, Sub Division-ii, O And M Div-xx
Removing Of Existing Damaged Cement Roofing Sheets And Replacing With 6mm Non Asbestos Cement Roofing Sheets In Natural Stone-gray Coloured For The Chemical Room In Asifnagar Filter Beds Including Carting Of Dismantling Materials Under Af Beds Section, Sd-ii, Transmission Division No.i, Himayathsagar
Raising And Reconstruction Of Damaged Compound Wall At Asifnagar Filter Beds Premises Under Asifnagar Filter Beds Section, Sd-ii, Transmission Division No.i, Himayathsagar
Manning And Operation Of Revenue Billing And Collection Manpower, Services For A Period Of 01 One Year Under O And M Divisions Xii, Xv And Xvi Of O And M Circle-iv
Removing Of Existing Damaged False Ceiling And Providing And Fixing False Ceiling At All Heights With 15mm Thick Eco-friendly Integral Densified Board/tegular Edged Light Weight Calcium Silicate False Ceiling Tiles Having Non Cementitious Calcium Silicate Reinforced With Fibers And Natural Fillers With Recycled Content Of More Than 50% False Ceiling Tiles Of Size 595x595 Mm Of Approved Texture, Design And Pattern Having Nrc For The In Asifnagar Filter Beds Including Carting Of Dismantling Materials Under Af Beds Section, Sd-ii, Transmission Division No.i, Himayathsagar