Preparation Of Detailed Project Report Dpr For Polavaram Nallamala Sagar Link Project As Per Cwc Guidelines Including Requisite Investigations And Other Job Works For Obtaining All Other Statuatory Clearances From Government Of India Organisations
Flood Protection Work In Banua Namen Tok Of Gram Panchayat Syaluka
Restoration Of Sompalli Kunta Near Chinnamupparam V Inugurthy M
Construction Of Rock Dump Bund To Nagavali River Near P.g.peta Village In Srikakulam Mandal Of Srikakulam Constituency
Temporary Repairs To The Damaged Weir Of Oora Cheruvu, Upparpally V Kesamudram M
Repairs And Renovation Of Circle Office At Hill Colony And Irrigation Division No.1 At Hill Colony Of Nagarjunasagar Dam
Releasing Of 1no Ht Service Connection With 80kva Cmd To Badvel Lift Scheme In The Name Of The Deputy Executive Engineer, Irrigation Sub Division, Badvel At Munnelliv, Badvelm Under Ht Cat 5-e At 11kv Potential In Operation Section, B. Koduru
Pjp Lmc Repairs And Reconstruction Of 2r Minor Pd Structure, Culvert And Drop Structure At Km 2.400 And Repairs To Lining Km 2.332 At Km 2.400 Km 3.085 Of D 19 Distributary At Pebbair Mandal
Installation Of Cctv Surveillance System At Entry/exit Points Of Official Colony Access And Inspection Bungalow, Estate Sub Division, Administrative Office Premises, E1, E2 & E3 Quarters For Strengthen The Security Arrangements At Tb Dam
Conducting Drone Aerial Survey For Quantifying The Cavities Formed On Spillway And Bucket Portion Of Nagarjuna Sagam Dam