Maintenance And Restoration Work Of Bhopal-Bypass Road In Km. 1, 2, 3 To 8, 10, 11, 13, 14, 15, 17, 20, 21, 22, 24, 26 To 35, 37, To 41, 44, 47, 52 Km. 1 And 2 In Both Side And Other Kms. In Rhs Only
Construction Work Of A New 4-lane Railway Over Bridge Rob Of 980 Meters Length From Harifatak Square To Neelkanth Dwar In Ujjain City, Including Two Additional 2-lane Legs Total Ramp Length 500 Meters - 140 Meters Towards Badnagar And 360 Mete Construction Work Of A New 4-lane Railway Over Bridge Rob Of 980 Meters Length From Harifatak Square To Neelkanth Dwar In Ujjain City, Including Two Additional 2-lane Legs Total Ramp Length 500 Meters - 140 Meters Towards Badnagar And 360 Meters
Repairs And Pot Hole Filling Work With Jet Patcher-repairs Work Of Roads Under Mprdc Division Narmadapuram, Chhindwara, Jabalpur, Rewa And Shahdol Group-1.
Upgradation And Reconstruction From Il To 2 Lane With Paved Shoulder Of Narmadapuram - Timarni Road Starting From Km. 0.000 Near Rob Gwaltoli And Terminating At Timarni Town, Excluding Rob At Dharamkundi And Flyover At Seoni Malwa In The State Of Mp
Construction Of 4 Lane Major Bridge At Km 1/4 On Lebad-ghatabillod Road Sh-38 Over Chambal River At Village Dehri Saray Gatabillod. Construction Of 4 Lane Major Bridge At Km 1/4 On Lebad-ghatabillod Road Sh-38 Over Chambal River At Village Dehri Saray Gatabillod
Repairs And Pot Hole Filling Work With Jet Patcher-repairs Work Of Roads Under Mprdc Division Bhopal, Gwalior, Sagar, Ujjain And Dhar Group-2
Widening Of Hata Town Portion From Ch 0.000 To 1.000 Of Hata-Patera-Kumhari Road Sh-23 Total Length- 1.00 Km
Consultancy Services For The Preparation Of Feasibility / Dpr For 2 And 4 Lanning With Paved Shoulder Of Selected Stretches Of Mdrs And State Highways Sh In The State Of Madhya Pradesh. Pkg-H Total Length - 382.46 Km. 2Nd Call
Gem Bids For Chana Dal (q4)
Construction Of Indore Ujjain Green Field Access Control 4 Lane With Paved Shoulder Project Highway Length 48.10 Km. Starting From Km. 0.000 Near Pitra Parvat And Terminating At Km. 48.100 Simhastha Bypass Km 2.600 On Hybrid Annuity Mode Ham