Appointment Of Consultant For Resource Adequacy Planning, Load Forecasting Automation, And Power Procurement Advisory Services
Replacement Of Damaged Rubber Lagging Sheet Of Pulleys Of Conveyor Belt System Of Coal Handling Plant,
Work Of Extension Of Switch House Building At 66kv Sub Station Gohalwarh
Construction Of Addl T/f Plinth Bay T-2 And Allied Civil Works Like Trenches, Gravel Spreading Etc. At 66 Kv S/s Sector-88, Under Operation Circle Deposit Work
Repair Of Roads In Chp Area Of Ghtp Lehra Mohabbat
Piping, Valves Etc. Of 2x210 Mw Stage-i And 2x250 Mw Stage-ii, Ghtp, Lehra-mohabbat And Mtc. Work Of Acs/ros Systems Etc. Gndtp, Bathinda Falling Under Mechanical Aux. Mtc. Cell On Lump-sum Basis. Round The Clock Operation, Maintenance And Overhauling Of Central Ac Plants Of Ucb, 220 Kv Switchyard Control Room, Package Ac Plants, Air Washer Systerms And Maintenance And Overhauling Of Window/split Acs, Water Coolers, Ros, All Connected
Special Repair Of Pspcl Vip Guest House
Various Works Such As Releasing Of T/well Connections, Gsc/isc Connections, Deloading Of Overloaded T/fs, Shifting Of Meters Outside Consumer Premises, Earthing Of Dts/lines Or Any Development Works
Procurement Of Generator Slip Ring Carbon Brushes
Procurement Of Journal Assy Bearing Hp 803 Bowl Mills.