M And R To Electrical Works Of Waghur Dam M And R With Colouring To Anchor Girder Bridge And Trunion Of Waghur Dam And Colouring To Control Cabin And Allied Works Of Waghur Dam
Regular Pre-monsoon Maintenance Repairs And Other Ancillary Works At Minor Irrigation Tanks Velhala Khandala Mondhala Under Irrigation Section Bhusawal
Maintenance And Repairing With Colouring Parapet Wall Of Waghur Dam And Colouring To Up Stream Side Radial Gates No 1 To 20 And Other Component Parts Waghur Dam And Oiling And Greasing To Radial Gate No 1 To 20 And Alied Works Of Waghur Dam
Operation Of Irrigation Outlet Submersible Pumps In Gallery And Maintenance And Repair Work Of Radial Gates And Complete Electrical System Of Hatnur Dam In The Month Of July 2025 To December 2025
M And R To Inspection Path Of Left H R Colouring And Oiling To Both Gantry And Allied Works
Construction Of Railway Crossing Work And Highway Crossing Work By Horizontal Pipe Pushing Method Under Sulwade Jamphal Kanoli Lift Irrigation Scheme Tal. Shindkheda Dist Dhule.
In 2025-26 Cr Gate Operation At Ch 12950 And 22608 For Irrigation Non Irrigation Work And Other Related Works On Hrbc Repairing Embankment Of Canal In Km 23 Of Hrbc
Concreting Work In The Eroded Areas Near The Roller Bucket Between Radial Gate No. 1 To 5 Of Hatnur Dam
Providing Painting To Up Stream Side Of Radial Gates And Other Components Of Hatnur Dam 1 To 41 Gates And Painting Of Parapet Wall At Hatnur Dam
Cleaning Of Vertical Porous Drain Pipes In The Drainage Gallery Of Hatnur Dam Using Redrilling