"नये भारत का नया Tender Portal"
Request a call back

Latest Tenders of united electrical industries limited

Total 409 tenders found
#TBR: 35238768 Closed

Electrical Products

  • Kerala
  • Due On: 02 Sep, 2025 (0 Days Left)

Repair And Maintenance Of Streetlights At Ambalappara Gp

Ref. Document
View Tender
#TBR: 35200205 Closed

Electrical Products

  • Kerala
  • Due On: 01 Sep, 2025 (0 Days Left)

Gem Bids For Led Luminaire For Floodlight V2 Conforming To Is 10322part 5/section 5 Q3 Pac Only

Ref. Document
View Tender
#TBR: 35236110 Closed

Electrical Products

  • Kerala
  • Due On: 02 Sep, 2025 (0 Days Left)

Supply, Installation, Testing And Commissioning Of 34 Numbers Of 8 Meter Minimast With 4x150w Led Flood Light In Ottapalam Lac Under Mla-ads.

Ref. Document
View Tender
#TBR: 35237423 Closed

Electrical Products

  • Kerala
  • Due On: 08 Sep, 2025 (0 Days Left)

The Supply Of 200 W Led Flood Lights At Kollam Corporation

Ref. Document
View Tender
#TBR: 35210651 Closed

Electrical Products

  • Kerala
  • Due On: 01 Sep, 2025 (0 Days Left)

Gem Bids For Led Luminaire For Floodlight V2 Conforming To Is 10322part 5/section 5 Q3 Pac Only . .

Ref. Document
View Tender
#TBR: 35208884 Closed

Electrical Products

  • Kerala
  • Due On: 01 Sep, 2025 (0 Days Left)

Gem Bids For Led Luminaire For Floodlight V2 Conforming To Is 10322part 5/section 5 Q3 Pac Only .

Ref. Document
View Tender
#TBR: 35237184 Closed

Electrical Products

  • Kerala
  • Due On: 02 Sep, 2025 (0 Days Left)

Streetlights Installation At Main Roads That Connects Various Tourism Centers In Kongad Lac

Ref. Document
View Tender
#TBR: 35238201 Closed

Electrical Products

  • Kerala
  • Due On: 02 Sep, 2025 (0 Days Left)

Supply, Installation, Testing And Commissioning Of 10 Numbers Of 9 Meter Minimast With 6 X150w Led Flood Light In Malampuzha Lac Under Mla-sdf.

Ref. Document
View Tender
#TBR: 35195891 Closed

Electrical Products

  • Kerala
  • Due On: 01 Sep, 2025 (0 Days Left)

Gem Bids For Led Luminaire For Floodlight V2 Conforming To Is 10322part 5/section 5 Q3 Pac Only . . % % 4 4   /mse Exemption For Years Ofexperience And Turnoverno& % & % . . % % 4 4   /startup Exemption For Years Ofexperience And Turnoverno 5  5 & & /document Requiredfrom Sellerexperience Criteria, Bidder Turnover, Certificate Requestedin Atc, Oem Authorization Certificate, Oem Annual Turnover*in Case Any Bidder Is Seeking Exemption From Experience /turnover Criteria, The Supporting Documents To Prove Hiseligibility For Exemption Must Be Uploaded For Evaluation Bythe Buyer7 7  9  9 : : ; ; & 9 & 9   < <  9  9 ; ; > >? ? % % /do You Want To Showdocuments Uploaded By Bidders To Allbidders Participated In Bid?no    -- B B C C  5  5   D D / Minimum Number Ofbids Required To Disable Automatic Bidextension1; 9; 9   D D, , G G     -- / / Number Of Days For Which Bidwould Be Auto--extended7  D /bid Number: Gem/2025/b/6591363; /dated: 20-08-2025  & & / Bid Document1 / 6   N %n % ;5 ;5 ; ; /bid To Ra Enabledno  4 4 /type Of Bidtwo Packet Bid   O O   & Q & Q /time Allowed For Technicalclarifications During Technical Evaluation2 Days r r B B S S r r 4 4 / % % < 9 < 9 : : /inspection Required Byempanelled Inspection Authority / Agenciespre-registered With Gemno O O S S /evaluation Methodtotal Value Wise Evaluation V & V & /arbitration Clauseno /mediation Clauseno    //bid Details     /emd Detail B /requiredno   /epbg Detail B /requiredno  /splitting   ; / Bid Splitting Not Applied.     /mse Purchase Preference   /mse Purchase Preferenceno     /mii Purchase Preference   /mii Purchase Preferenceno V & V &   R R 4 4    :/details Of The Competent Authority Approvalfor Paccompetent Authority Approval Document For Pac : View Document R 4  /name Of Competentauthorityp Aneesh Babu2 / 6 R 4  /designation Of Competentauthoritymanaging Director R 4  % / /4 /o Ce /department / Division Of Competent Authorityunited Electrical Industries Limited, Kollam D /ca Approval Numberpac 005/eravipuram/2025-26 R 4  /competent Authorityapproval Date2025-06-19 00:00:00 R 4  : 4  & Grw /brief Description Of The Approval Grantedby Competent Authorityno Other Make/model Is Acceptable For The Followingreasons: The Mla Of Eravipuram Lac Has Asked To Supply Crompton Brand Which Is Having High Quality Andexcellent After Sale Onsite Service. Crompton Brand Ispreviously Used For Ueil Projects Executed In Kollamcorporation And Various Panchayaths In Kollam District.1. Estimated Bid Value Indicated Above Is Being Declared Solely For The Purpose Of Guidance On Emd Amount Andfor Determining The Eligibility Criteria Related To Turn Over, Past Performance And Project / Past Experience Etc.this Has No Relevance Or Bearing On The Price To Be Quoted By The Bidders And Is Also Not Going To Have Anyimpact On Bid Participation. Also This Is Not Going To Be Used As A Criteria In Determining Reasonableness Ofquoted Prices Which Would Be Determined By The Buyer Based On Its Own Assessment Of Reasonableness Andbased On Competitive Prices Received In Bid / Ra Process. Led Luminaire For Floodlight V2 Conforming To Is 10322 Part 5/section 5 28pieces Under Pac Bis Requiredyesmakecromptonmodelcromptonroverplus150wledfloodlight    q  q /technical Specifications*   q / As Per Gem Category Speci Cation  /speci Cation q q /specificationname  B B O O /bid Requirementallowed Valuesled Ratingled Rating/systemwattage/rated Power Inwatts150   //n ; Y N ; Y   /consignees/reporting Officer And Quantity5. .5. ./s.no.   //n ; Y N ; Y   /consigneereporting/officer /address /quantity; ;  ; ; /deliverydays1sheeba R691010, Pallimukku Eravipuramkollam Kerala - 69101028153 / 6 5 : :         \ \/buyer Added Bid Specific Terms And Conditions1. Genericoption Clause: The Purchaser Reserves The Right To Increase Or Decrease The Quantity To Be Ordered Upto 25 Percent Of Bid Quantity At The Time Of Placement Of Contract. The Purchaser Also Reserves The Right Toincrease The Ordered Quantity Up To 25% Of The Contracted Quantity During The Currency Of The Contract Atthe Contracted Rates. The Delivery Period Of Quantity Shall Commence From The Last Date Of Originaldelivery Order And In Cases Where Option Clause Is Exercised During The Extended Delivery Period Theadditional Time Shall Commence From The Last Date Of Extended Delivery Period. The Additional Deliverytime Shall Be Increased Quantity Original Quantity Original Delivery Period In Days, Subject Tominimum Of 30 Days. If The Original Delivery Period Is Less Than 30 Days, The Additional Time Equals Theoriginal Delivery Period. The Purchaser May Extend This Calculated Delivery Duration Up To The Originaldelivery Period While Exercising The Option Clause. Bidders Must Comply With These Terms.2. Genericexperience Criteria: The Bidder Or Its Oem Themselves Or Through Resellers Should Have Regularly, Manufactured And Supplied Same Or

Ref. Document
View Tender
#TBR: 35191944 Closed

Electrical Products

  • Kerala
  • Due On: 30 Aug, 2025 (0 Days Left)

Gem Bids For Led Luminaire For Floodlight V2 Conforming To Is 10322part 5/section 5 Q3

Ref. Document
View Tender
Download Document