Design And Preparation Of The Emergency Action Plan Eap For The Chinchwadi Minor Irrigation Project As Per The Revised Norms Of The Central Water Commission Cwc. Chinchwadi Eap
Design And Preparation Of The Emergency Action Plan Eap For The Muchkundi Large Minor Irrigation Project As Per The Revised Norms Of The Central Water Commission Cwc. Much Eap
Construction Of Guard Wall Length-300And Height-6 At Right Bank Of Tenu Bokaro Canal From Chain 162.00 To 165.00
Emergent Rcc Lining 2025-26 Of Tenu - Bokaro Canal From Chain 642.00 To Chain 645.00 Of Right Side Length 300.00 Feet Under Tenughat Dam Division, Tenughat.
Emergent Rcc Lining 2025-26 Of Tenu - Bokaro Canal From Chain 956.00 To Chain 957.00 Of Right Side Length 100.00 Feet Under Tenughat Dam Division, Tenughat.
Retrofitting Of Existing Vt Pumps 1062 Hp 7 Nos. With Replacement Of Bowl Unit Column Pipe And Rotating Components At Mhaisal Stage- I Lis.
Construction Of Check Dam On Mikirdang Joriya, Under Block- Gopikander, District - Dumka.
Construction Of Single Check Dam On Delikarcha Nala, Village - Parhi Kenatoli, G.P - Reingai, Block- Mahuadanr, Distt. - Latehar
Restoration Dry Stone Pitching And Embankment U/s Side Of Dam, Near H.r. And Constructing Retaining Wall Near Tail Channel Of Waste Weir At Lore M. I. Scheme, Tal - Kankavli
Construction Of Pcc Road, Supaydih. Under Block - Jamtara, District - Jamtara