Am To Thumpally X Road To Machareddy X Road Via Annaram From Km 0/0 To 12/3
Fdr 2025 Temporary Flood Damage Repairs To Bund Slip On D/s Of Left Bank And Left Side Bank Raising And Removal Of Deposited Earth From Canal Bed Of Pocharam Main Canal At Various Locations From Km 11.350 To Km 12.080 Near Nagireddypetv M
Fdr-2025-permanent Flood Damage Repairs To Breach Occured To Left Side Bank Of Distributory No.73 From Ch 0.00 To Ch 18.00m Of Pocharam Canal Besides Right Side Pick Up Weir Of Large Tank, Timmareddy V, Yellareddy M
Fdr-2025- Emergency Flood Damage Repairs To Collapsed Right Side Guide Wall From Ch.3.00m To 27.00m Of The Right Side Irrigation Channel Under Left Flank Sluice Of Pedda Cheru, Vellutlav, Yellareddym
Fdr 2025-emergency Flood Damage Repairs To Breaches Occurred To Left Bank From Ch 116.00m To Ch 136.00m And Ch 378.00m To 388.00m And Bank Slipped At Various Locations On Downstream Of Left Bank Of Irrigation Channel And Breached Bank Of Feeder Channel Of Chinna Mathadi, Advilingalv, Yellareddym
Fdr 2025 -emergency Flood Damage Repairs To R/s Bank Of Feeder Channel From Ch.726.0 M To 744.0 M Of Chowdhary Cheru, Bhavanipet V, Lingampetm
Fdr-2025- Emergency Flood Damage Repairs To Collapsed Downstream Head Wall Of Hp Culvert At Km 3.366 Of Distributory No.d38/a Of Pocharam Canal Near Malkapur V, Yellareddym
Fdr-2025-emergency Flood Damage Repairs To Damaged Pick Up Weir And Middle Weir Of Keshaipet Cheru, Pothaipally V, Lingampet M, Kamareddyd
Construction Of Rain Water Harvesting System To Tsms Nizamsagar V Nizamsagar M Zphs Pedda Kodapgal V Pedda Kodapgal M Zphs Pulkal V Bichkunda M Zphs Khadeballur V Jukkal M And Kgbv Madnoor V Madnoor M Pm Shri Phase-i Under Package-5
Construction Of Rain Water Harvesting System To Zphs Chillargi V Pitlam M Zphs Madnoor V Madnoor M And Tswreis G Takkadpally V Pedda Kodapgal M Pm Shri Phase-ii Under Package-14 Reservation For Sc