Urgent Track Maintenance For Tok-pnmb Bye-pass Line Under Sse/ud Section On Konkan Railway In Karnataka State (e File : 57465)
Dismantling Of Existing Escalator Of Platform No.1 Of Madgaon Railway Station, Packing, Loading, Transporting, Shifting And Unloading At 11kv Sub Station At Madgaon.
Extension Of Pit Line-2 Towards Maq End As Per Drso Design With One Side Inspection Pathway And Diversion Of Lc-47 Road Under Aen/mao Section (e-file No 60579).
Overhauling Of Navyug Make Electrically Operated Jack Of Krcl-kawr Region .
Rail Renewal For 70 Track Kms (tkm) Length With 52 Kg, 260m Rail Panels At Identified Stretches Under Sen Udupi Section From Km 556/600 To Km 739/760 In Senior Regional Engineer, Karwar In Karnataka State. (computer No.69818, Rate Quoted Shall Be Excluding Gst. Gst Shall Be Payable As Applicable)
Construction Of 5m Length Of Pit Line For Art Maintenance On Art Stabling Line At Ven Yard Under Sen/mao Section.
Construction Of P-way Store Shed At Verna, Madgaon, Karwar, Bhatkal And Surathkal Under Srren/kawr Section
Construction Of Rcc Retaining Wall In Between Km 465/4-6 At Padi South Cutting In Blli-cno Section Of Karwar Region Of Krcl. (e-file Comp. No. 63299)
Diversion Of Seepage Water From Crown Inside Tunnels Under Sse/btjl Section (e File Comp No. 58515)
Annual Maintenance Contract For Lighting Arrangements Provided For Tunnels, Stations, Platforms, Approach Roads, Circulating Area And Service Buildings, Etc. Between Asnoti To Thokur Stations Under Karwar Region On Konkan Railway Route In The State Of Karnataka.