Balance Work Of Earthwork Excavation, Formation Of Embankment, Including Lining And Construction Of C D Works From Ch 0.00 To 3.448 Km Of Minor-5 Offtaking At Ch 27.58 Km Of Distributory No-6, From Ch 0.00 To 1.541 Of Sub Minor -1 Offtaking At Ch 0.418 Km Of Minor -5, From Ch 0.00 To 0.676 Km Of Branch Minor -1 Offtaking At Ch 0.440 Km Of Sub Minor -1 Of Mlnor - 5 From Ch 0.000 To 0.985 Km Sub Minor 2 Offtaking Ch 0.418 Km Of Minor 5 Of Distributory 6 Under Utp Main Canal
Earthwork Excavation Formation Of Embankment Improvement Work For Selected Reaches By Providing Canal Lining To Canal Damaged Portion Due To Rain Flooding And Control The Seepage To Adjacent Affected Lands From Ch. 25.00Km To Ch.40.00Km Of Dy-2 Offtaking Ch 166.267Km Under Utp Canal Network
Earthwork Excavation Formation Of Embankment Providing Canal Lining To Canal Damaged Portion Due To Rain Flooding And Control The Seepage To Adjacent Lands Improvements To Sr And Ip Of Dy-3 Km 1.00 To 23.00 Km And Its Minor-1 To 14 Of Dy-3 Under Utp Main Canal
Balance Earthwork Excavation, Formation Of Embankment, Including Lining And Construction Of C D Works For Sub Minor-2& 3 Of Direct Minor-52 And Lateral 1 & 2 Of Sub Minor-2 Of Direct Minor-52 Off Taking From Ch-222.697 Of Utp Main Canal
Earthwork Excavation, Formation Of Embankment, Providing Canal Lining To Canal Damaged Portion Due To Rain Flooding And Control The Seepage To Adjacent Lands Improvements To Sr And Ip Of Sub Dy Km 0.00 To 14.00Km And Its Minors 1 To 7 Under Dy-3 Canal Under Utp Canal Network.
Balance Earthwork Excavation, Formation Of Embankment, Including Lining And Construction Of C D Works For Sub Minor-1Km-2, 3&4 Of Direct Minor-52 And Lateral Of Sub Minor-1 Of Direct Minor-52 Off Taking From Ch-222.697 Of Utp Main Canal
Earthwork Excavation Formation Of Embankment Improvement Work For Selected Reaches By Providing Canal Lining To Canal Damaged Portion Due To Rain Flooding And Control The Seepage To Adjacent Affected Lands From Ch 0.00Km To Ch.25.00Km Of Dy-2 Offtaking Ch.166.267Km Under Utp Canal Network.
Balance Earthwork Excavation, Formation Of Embankment, Including Lining And Construction Of C D Works For Direct Minor-52Km 1, 2 & 3 And Sub Minor-1Km-1 Of Direct Minor-52 Off Taking From Ch-222.697 Of Utp Main Canal
Providing Essential And Maitenance Pertaining To Office Of Division And Sub-Division Bhadra Cada
Restoration And Improvements Works For Flood Damage Coming Under Utp Main Canal Km 130.00 To 156.00 Km Some Selected Reaches From Ch.132.450 To 132.550, 152.900 To 153.050, 153.140 To 153.390, M-20 0.00 To 0.150 & M-23 0.00 To 3.020Kmand Its Minors Subminors And Construction Of Necessary Structures For Farmers Of Rattihalli Taluk Haveri District For The Year 2024-25