Balance Work & Completion (design, Construction, Supply, Commissioning At Dobhi, Gudru & Amas Block On Turnkey Basis Under The Provision Of "har Ghar Nal Ka Jal Yojna
Balance Work And Completion Design , Construction , Supply , Commissioning At Dobhi , Gudru And Amas Block On Turn Key Basis Under The Provision Of Har Ghar Nal Ka Jal Yojana
Widening & Strengthening Imamganj To Pakari Via Kothi, Salaiya Road From Km 0.00 To Km 24.50 (total Length -24.50km_from Single To Double Lane For The Year 2024-25 Under Road Division
Design, Construction, Supply, Testing & Commissioning Of Water Supply Scheme Wls With Electric Driven Pumps On Trun Key Basis Under Har Ghar Nal Ka Jal Yojna In Different Leftout Habitation Of Prd Ward In Block:-Imamganj In Dist-Gaya Under P.H Division
Design, Construction, Supply, Testing & Commissioning Of Water Supply Scheme With Electric Driven Pumps On Trun Key Basis Under Har Ghar Nal Ka Jal Yojna In Different Leftout Habitation Of Prd Ward In Block:-Sherghati In Dist-Gaya Under P.H Division
Design, Construction, Supply, Testing & Commissioning Of Water Supply Scheme With Electric Driven Pumps On Trun Key Basis Under Har Ghar Nal Ka Jal Yojna In Different Leftout Habitation Of Prd Ward In Block:-Mohanpur In Dist-Gaya Under P.H Division
Design, Construction, Supply Of Materials, Testing And Commissioning Of Piped Water Supply Schemes Ward Level Schemes For Habitations Left Out Under Har Ghar Nal Ka Jal Nischayyojna In Panchayats Where Har Ghar Nal Ka Jal Was Executed By The Panchayati Raj Department With Electric Driven Pumps In The District Of Gaya, Under P.H. Division, Sherghati, Bihar On Turn-Key Basis With 3 Months Trial Run Period
Construction Work In Mau Kurkut Bigha Usas Deora Road Km 0.00 To 8.20 Under Road Division Sherghati For The Year 2024-25
Design, Construction, Supply, Testing And Commissioning Of Piped Water Supply Schemes For Habitation Left Out Under Har Ghar Nal Ka Jal Nischay Yojna In Areas Having Ground Water Quality Issues With Electric Driven Pumps In The District Of Gaya Under Jurisdiction Of Ph Division On Turn Key Basis With 6 Months Trail Run Period And Comprehensive Operation And Maintenance Of 60 Months Under Mukhyamantri Grameen Peyjal Nishchay Yojna
Surface Renewal Work In Amas Naudiha Kasma Road Km 0.00 To 9.80 Under Road Division