Supply Of Air Operated-02 Port Valve Size-1/4.
Supply Of Air Operated 2 Port Valve Size 1/2.
Gem Bids For Procurement, High-pressure Air Operated Sealant Hyper Gun, Valve Purge Cleaner Or Lubricants Vlv Lub Or Clnr, Valve Sealant Eq To Btr Part No Shk0c7v Qg, Valvesealant Eq To Btr Part No Shf0c3v Qg, Highpotency Cleaner Grade C In 20 Kg Or 25 Liters
Supply Of Screw Driver 8 Long,sleeve Dn150 Pn16,temp. Sensor Md2r-ck80-18x1.5-90-2-f1a,female Plug 35 Cts No.532418,injector Tappet,bush Distance,temperature Sensor Brg Temp Sensor,o Ring,collar Split,o Ring,ring,injector Nozzle,starting Air Valve Assembly,spring,clamping Collar,gasket,sheathed Injection Pipe,nut For Shaft,locking Plate Abb No.7023,bearing Unit,gasket,spool Valve Air Operated 2 Pilots Location 15,logic Unit And,logic Unit Where,seal-balmo Fuel Feed Pump,gasket,25 Pin Socket Insert Plug Jaeger,o Ring For Inspection Door L 1300 Mm Long,stand By Pump Suction Connection,fuel Feed Pump Leak Connection,starting Air Inlet Connection,bush,loctite 242,bush,ring D164 3.5d Nse 6.531 60c7,o Ring,o-ring D135 3d Nse6.531 60c7,contact Xck M1 D10,turbo Charger Exhaust Inlet Temp Sensor,fuel Rack Measure Card(frm),bearing Temp. Display Card,valve Guide,inlet Valve,punched Joint,cord Rubber,oil Guage,sealing Bush -abb Vtr 321 T C Ref 507,sleeve Nt1-cc-pn16-dn40-av-cb,bearing Roller,scraper Ring Assembly,m/e Sensor Pt-100 Depth 90mm,o Ring An 75,solenoid Valve Nc(5/6),shaft Speed Sensor,o Ring,overspeed Air Solenoid Valve 241 No 24v,gasket Cylinder Head,o Ring,gasket,o-ring An 49,nse6.5,60c7,joint - Glacier Filter,piston Ring - Top
Procurement Of Boiler Air Preheater Co Analyser Spares, 47 Heated Primary Filter Sample Probe Gas Suction Pump Peristaltic Pump Fine Filter Guard Filter Solenoid Valve For Sample Selection Blowback Calibration Sample Gas Cooler Three Way Air Operated Blowback Valve
Supply of Air Operated 2 Port Valve.
Procurement Of Air Operated Ball Valve Complete Assembly
Supply of 10 Spares For Control Valve Large Asdv Sl. No. 242035 To 242039.38-41312 12 Ansi# 600 Cv-1400 Sg 90% Feed Cv 38-41911 Size: 6 Inch Rating-600# Body-Astm A217 Grwc6 End Conn-Weld End Sg 10% Feed Cv 37-41611 Size-3 Inch Rating - 600# Body-Astm A217 Grwc6 End Conn- Weld End Air Operated Bellow Sealed Globe Valve Assembly 50 Mm 900 Rating Bw End 12? Piston Actuator
Supply of Valves And Service Kit For Koepe Winder, 12 688800161 Pilot Service 688800199 Valve Ross Solenoid 688800200 Valve Ross Solenoid 688800201 Valve Ross Solenoid 688800511 Shuttle Valve 688800510 3 By 2 Way Air Operated Valve
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Removal Of Back Pull Out Assembly And Installation Of Spare Back Pull Out Assembly Of Pump For Details Refer Boq Item No 1 In Sow And 01 Quantity Is Equ.., Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Decoupling Alignment And Coupling Of Pump And Motor Having Motor Rating Up To 60 Kwe For Details Refer Boq Item No 2 In Sow And 01 Quantity Is Equal To .., Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Motor Of Rating From 30 Kwe To 60 Kwe For Details Refer Boq Item No 3 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow And Atc, Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Manual Operated Valve .., Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Maintenance Of Actuator Of Control Valve Having Diaphragm For Details Refer Boq Item No 5 In Sow And 01 Quantity Is Equal To 4 Nos; As Per Sow And Atc, Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Primary Circulating Pump Dismantling Maintenance Assembly Test Run For Details Refer Boq Item No 6 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow.., Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Opening And Box Up Of Shutdown Cooling Heat Exchanger Moderator Heat Exchanger For Details Refer Boq Item No 7 In Sow And 01 Quantity Is Equal To 2 Nos.., Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Opening And Box Up Of Both Primary Sides Of One Steam Generator For Isi For Details Refer Boq Item No 8 In Sow And 01 Quantity Is Equal To 1 Nos, Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Primary Circulating Pump Thrust Bearing Overhauling For Details Refer Boq Item No 10 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow And Atc, Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Primary Circulating Pump Pcp And Its Motorfor Details Refer Boq Item No 11 In Sow And 01 Quantity Is Equal To 2 Nos; As.., Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Electrical Actuator Operated Piston Type Air Actuator Operated Valve For Details Refer Boq Item No12 In Sow And 01 Quantity Is Equal To 8.., Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Guide Nut Inspection Of Emergency Core Cooling System Shut Down Cooling Size 8 Inch To 12 Inchfor Details Refer Boq Item No 13 In Sow And 01 Quantity I.., Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Emergency Core Cooling System Shut Down Cooling For Details Refer Boq Item No 14 In Sow And 01 Quantity Is Equal To 16.., Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Control Valve With Valve Size Up To 6 Inches For Details Refer Boq Item No 15 In Sow And 01 Quantity Is Equal To 4 Nos; As Per Sow And At.., Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Motor With Electrical Rating From 65 Kwe To 400 Kwe For Details Refer Boq Item No 16 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow.., Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Primary Pressurizing Pumpfor Details Refer Boq Item No 17 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow And Atc, Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Replacement Of Door Seals Of Reactor Building Main Air Lock Equipment Doorfor Details Refer Boq Item No 18 In Sow And 01 Quantity Is Equal To 3 Nos; As .., Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Moderator Pump Replacement For Details Refer Boq Item No 19 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow And Atc, Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Manual Bellow Sealed Valvefor Details Refer Boq Item No 20 In Sow And 01 Quantity Is Equal To 50 Nos; As Per Sow And At.., Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Diaphragm Replacement Of Diaphragm Valve For Details Refer Boq Item No 21 In Sow And 01 Quantity Is Equal To 80 Nos; As Per Sow And Atc, Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Replacement Or Cleaning Of Strainer Filter For Details Refer Boq Item No 22 In Sow And 01 Quantity Is Equal To 25 Inch Dia; As Per Sow And Atc, Repair, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Replacement Of Relief Valve For Details Refer Boq Item No 23 In Sow And 01 Quantity Is Equal To 8 Nos; As Per Sow And Atc, Etc