Ttps Operation Circle Mpm I Unit I Overhauling And Reconditioning Of Hot And Cold Air Dampers, Gates, Ducts, Replacement Of Expansion Joints, Seal Air Fan And Cleaning Of Accumulated Fly Ash Deposited Inside The Horizontal Portion Of The Hot Air Duct
Ttps Es Em Ii Unit Ii Charges For Routine Cleaning Of Fly Ash And Coal Dust From The Cable Trays And Cable Ducts In And Around Boiler Area And Mill Area Etc And Routine Cleaning Minor Maintenance Work Of Boiler Side Fan Motors Mill Motors Lub Oil
Desilting Of Silt Sandy Clay And Other Assorted Materials From Ash Water Pump Chambers Of Unit 5 At Btps De Silting Of Silt Sandy Clay And Other Assorted Materials From Ash Water Pump Chambers Of Unit5 At Btps
Approach Road Construction In The Ash Slurry Line Area From Wbpdcl Gate No-4 To Rack Near Ash Pond Through Landt Colony Area.
Evacuation Of Ash From The Boiler, Esp, Bottom Ash Hopper, I.d Fan Area, Related To Overhauling Of Unit # 06 At Ktps
Ttps Es Circle Em Iii Routine Cleaning Of Fly Ash And Coal Dust In The Ht Fan Motors Mill Motors Cable Trays In Unit Iv V For A Period Of Twelve Months From 01 04 2026 To 31 03 2027
Ttps Es Circle Em Iii Fault Attending In Boiler Auxiliary Motors And Modules Valve Motors Soot Blower Motor And Preventive Maintenance Of Ash Silo Transformer A And B Of Unit Iv V For The Period From 01 04 2026 To 31 03 2027
Ttps Es Em Ii Unit I Charges For Routine Cleaning Of Fly Ash And Coal Dust From The Cable Trays And Cable Ducts In And Around Boiler Area And Mill Area Etc And Routine Cleaning Minor Maintenance Work Of Boiler Side Fan Motors Mill Motors Lub Oil M
Ttps Operation Circle Mpm I Unit Ii Removal Of All The Damaged Insulation In The Hot Primary Air Ducts From Air Preheaters To Mills And Insulating The Ducts With Lrb Wool Mattresses And Cladding With G.I Sheet Of 0.63Mm Thickness And Removal Of Ash A
Ttps Mech Ii Bm Unit Ii Cleaning Of Ash Deposits From The Headers Supply Tubes Hangers In Penthouse During The Year 2025 2026