Nctps Isemii Circle Ahp Dn Unit I Eco Hopper Renewal Of Existing Eroded And Damaged Ash Slurry Disposal Ms Pipe Line With Cast Basalt Pipes And Fittings In Unit I During Available Shutdown
Upkeep And Support In Dry And Wet Fly Ash Disposal System And Disposal System Drains Cleaning 2025 - 26
Gem Bids For Custom Bid For Services - 200141709 Biannual Maintenance Contract For Routine Patrolling, Overhauling And Breakdown For Ash Disposal Linesand Awrs System At Ntpc Barh St-i And St-ii
Overhauling Works In Unit Iii Eco Aph Hoppers Ash Disposal System Flushing Apparatus Rubber Expansion Bellow And Allied Sea Water Pipe Lines Fittings Valves And Rectification Work In Eco Aph Hopper Platforms 20
Providing Brick Masonry Pedestals For Extension Of Ash Disposal Pipe Lines Wherever And Whenever Required Inside Of Ab Pond Of Ktps-v And Vi Stages And Northern Ash Pond-i, Ii Of Ktps-vii Stage, Paloncha During The Year 2025-26.
Ttps Mech Ii Ahp Replacing The Clinker Grinder Feed Gate Assembly Power Cylinders And Its Connected Pipe Lines Feed Sump Hydraulic Ejector Assembly Etc In Unit Iii Bottom Ash Hopper Ash Disposal System During Annual Overhaul 2025 26
Enquiry Of Work Contract For Compliance Audit By Auditors Outhorized By Cpcb To Undertake Compliance Audit For Ash Disposal By Sgtps, Mppgcl, Birsinghpur As Per Moef And Cc Notification No. 5481 E Dtd. 31.12.2021 For Ash Utilization.
Compliance Audit For Ash Disposal By Stage I 2X600mw Sstpp, Dongalia As Per Moef And Cc Notification No. 5481 E Dated 31.12.2021 For Ash Utilization In The Fy 2024 25.
Gem Bids For Coupling Sets For Bottom Ash Slurry Disposal Pumps And Bottom Ash Overflow Pumps
Evacuation Of 10 Lakh Cum Of Settled Ash, Transportation And Disposal In Ecofriendly Manner From Ash Pond Of Sagardighi Thermal Power Project Evacuation Of 10 Lakh Cum Of Settled Ash From Sgtpp