Tender Bharat Website covers all Tenders for ballast – Including ballast Government Tenders, e Tender ballast, ballast Tenders and Private Tenders. There is no shortage of business opportunities from the largest ballast Tender Database.
Our website allows you to find ballast tenders online quickly and easily. Subscribers can also opt to receive daily tender alerts through email from TenderBharat.com to guarantee they don't miss out on any opportunities.
Supply Of Rakes Forged One Piece Hardened And Tempered As Per 1591/1971 With Amndt No.1 Reaffirmed 1999 Without Handle Sr. No.1..
Supply Of Material - Black 80 Mm ,black 40 Mm ,black 20 Mm ,murum ,sand ,cement 53 ,iron 12 Mm ,iron 10 Mm
Supply Of Material - 80 Mm. Metal White-(hand Broken Metal) With Royalty ,40 Mm Metal White- (hand Broken Metal) With Royalty ,black 20 Mm , Sand , Bricks , Cement , Murum ,iron 16 Mm ,81 Mm. Metal White-(hand Broken Metal) With Royalty , Khila ,bitumen Pad , Paver Block , Commode Seat
Manufacturing Supply And Stacking Of Machine Crushed Track Including Recoupment Of In Running Line In Connection With Estimate No.56/engg/ap/ii Of 2024-25, 52/engg/ap/ii Of 2024-25 & 03/engg/ap/ii Of 2025-26 Under Den/ii/apdj.
I Tfr 21.638 Km Between Dmf-buf, Dmf-link C Under Sse/p.way/dmf Ii Through Renewal For 4.00 Km From Km Along With Deep Screening/raising Of Cushion To 35 Cm From Km 452.00-456.00 S/l Under Aden/bndm Iii Ctr P For 13.702 Km New 60 Kg 260 Mtr Rail On Psc Rt-8746 1660 Nos. /km Existing Psc Sleeper In Between A Cabin Bondamunda -buf-bxf Under The Jurisdiction Of Aden/bndm.
I Trr P Of 7.661 Km Over Aged Rail Renewal Over Major Bridges And Its Approaches Under The Jurisdiction Of Sse/p.way-ii/bndm Ii Rajkhasawan- Bondamunda - Through Renewal Of Points And Crossings Under The Jurisdiction Of Aden/west/ckp
Procurement Of 111446 Cum 50mm Stone And Loading In To Hoppers In Adraj Moti Depot.
Supplying, Stacking And Loading Into Hoppers Of 65 Mm Gauge 100000 Cum Machine Crushed At Chachura-binaganj Depot Under Aden Shajapur Section.
Earth Work In Embankment/cutting, Blanketing, Construction Of Minor Bridges Including Rub/lhs, Major Bridge, Rob, P-way Works, Supply And Other Miscellaneous Works For Construction Of Guna Bypass Line Ch: Km1087.650 Km To 1091.665 Km And Ruthiyai Bypass Line Ch: Km 0.000 Km To 1+600 Km In Bhopal Division Of West Central Railway.
Provision Of Less Track Blt At Kota Station Loop Line No.-5, C/l Pf-3, 8 C/l Pf-4, Pf-2a & Pf-3a