(i) Udn-usd Section- Raising Of Approach Walls, Roads, Earthworks, Grouting, Etc. To Avoid Seepage, Runoff Water & Waterlogging On Various Rub Under Aden-vya Section. (ii) Udn-usd Section Strengthening Of Toe Wall, Return Wall, Ballast Wall, Slab, Pier Abutment Etc. Of Major Bridge No 17, 52a, 26, 60, 63 & 70.
Provision Of Ballast Retaining Wall, Railway Barricading And Fencing Works Under The Jurisdiction Of Sr.den/ii/tsk
Repair To Various Protection Works Such As Ballast Wall Toe Wall, Curtain Wall, Flooring Etc And Side Drains Between Up & Dn Tracks On All Major Bridges Bet Ex- Ngp To Ex Kt, Kav-krdi, Knhn-rtk Under The Jurisdiction Of Aden/tr/ngp.
"(1) Construction Of Ladies Changing Room With Toilet/bathroom At Rpf Post/out Post, Gondia And Dongargarh. (2) Construction Rcc Road For The Station Approach At Dhanoli Station Under The Jurisdiction Of Aden/gondia. (3) Provision Of 01 Nos Pressure Filter Plant At Dongargarh Under The Jurisdiction Of Aden/dongargarh. (4) Provision Of Ballast Retaining, Wall Inspection Steps, Raising Parapet Wall, Cess Repair Work On Either Approaches Of Major Bridge Under The Jurisdiction Of Aden/dongargarh. (5) Provision Of Facilities At Stations For Differently Abled Persons (divyangajans) At Stations Under The Jurisdiction Of Sr.deneast/ngp."
(i) Udn-usd Section- Raising Of Approach Walls, Roads, Earthworks, Grouting, Etc. To Avoid Seepage, Runoff Water & Waterlogging On Various Rub Under Aden-vya Section. (ii) Udn-usd Section Strengthening Of Toe Wall, Return Wall, Ballast Wall, Slab, Pier Abutment Etc. Of Major Bridge No 17, 52a, 26, 60, 63 & 70.
1) Igp-bsl Section- Rehabilitation Of Arch Bridge No. 160/1 Up By Interning & Jacketing Along With Extension Of Barrel Length. U 24-25 Pid No. 01.01.32.24.3.50.007 2)aden Mmr Jurisdiction(igp-nr) - Strengthening / Miscellaneous Works At Various Bridges Like ( Jacketing To Ww/rw, Face Wall, Flooring/ Apron , Ballast Wall, Parapet Wall, Cpg, Epoxy Grouting, Inspection Steps, Etc.) 58 Bridges Uwp 23-24 Pid No. 01.01.32.24.3 .50.002
Earthwork In Formation, Construction Of Major And Minor Bridges, Retaining Wall, Drains, Supply Of Ballast, Pway Materials And Track Linking Works, Construction Of Building And Allied Works For Rail Connectivity For Proposed Phase Ii Silo At Lakhanpur Mcl Lakhanpur Phase Ii
Sr. Den E Jurisdiction - Strengthening / Miscellaneous Works At Various Bridges Like Jacketing, Cpg, Epoxy Grouting, Ww/Rw, Flooring/ Apron, Ballast Wall, Parapet Wall, Height Gauge, Waterway Clearance Etc. 46 Bridges Uwp 24-25, Pid No. 01.01.32.25.3.50.003
Sw I : Bengaluru - Sampige Road Section : Construction Of Rcc Drain For A Length Of 1500M And Ballast Retaining Wall For A Length Of 1000M In Connection With The Work Of Complete Track Renewal P Of Existing 52Kg Rails On 60Kg Psc Of 1540 Nos/Km With 60Kg/90Uts Rails And 60Kg Wider Based Sleeper Of 1660/Km For A Length Of 19.4 Tkm From Km 49/000-68/400 Dn Line In Aden/Ypr Section. Sw Ii : Bengaluru - Sampige Road Section : Construction Of Drain For A Length Of 750M And Ballast Retaining Wall For A Length Of 500M In Connection With The Work Of Complete Track Renewal P Of Existing 52Kg Rails On 52Kg Psc Of 1540 Nos/Km With 60Kg/90Uts Rails And 60Kg Wider Base Sleeper Of 1660/Km For A Length Of 17.15 Km From Km 17/650-10/500 And 39/000-49/000 Dn Line In Aden/Yesvanthpur Section. Sw Iii : Bengaluru - Sampige Road Sec: Proposed Construction Of Ballast Retaining Wall For A Length Of 1150M In Connection With The Work Of Complete Track Renewal P Of Existing 52Kg Rails On 52Kg Psc Of 1540 Nos/Km With 60Kg/90Uts Rails And 60Kg Wider Base Sleeper Of 1660/Km For A Length Of 21.35 Km From Km 17/650 - 39/000 Up Line In Aden/Ypr Section. Maintenance Period Is 6 Months
Improvement To Bridge Approach Including Construction Of Ballast Retaining Wall, Widening Of Cess, Cess/Catch Water Drain Etc. Under The Jurisdiction Of Den/West/Kgp.