Supply And Application Of Anti-Corrosive Paint In Recovery Boiler Chimney Structural Staircase At Tnpl Unit-Ii Supply And Application Of Anti-Corrosive Paint In Recovery Boiler Chimney Structural Staircase At Tnpl Unit-Ii Trichy
E-tender For The Design, Fabrication, And Installation Of A Chimney For The Coal Boiler Installed At Ujjain Dugdh Sangh. I Call E-tender For The Design, Fabrication, And Installation Of A Chimney For The Coal Boiler Installed At Ujjain Dugdh Sangh.
Repairs Of Secondary Air Duct Aph Out Let To Wind Box Inlet & Flue Gas Duct Economizer Outlet To Aph And Esp Outlet To Chimney Area At The Boiler Of Unit-ii Including T & P, Consumables During The Running And Annual Overhaul Period 2025-26 Sdstps
Replacement / Repairing Of All Types Of Ducting Cold Air Ducts, Hot Air Ducts, Flue Gas Ducts Etc. From Boiler To Chimney, Metallic Expansion Bellows / Round Corner Expansion Joints Rcejs Of Ducting And Fabric Compensator / Conveyor Belt From Ou Mp-6139/Ducting Works/2024
Renovation And Strengthening Of Rcc Chimney In Boiler #6 Upto 90.0mtr Height At Tnpl Unit I
Supply And Application Of Zinc Rich Paint For Flue Gas Duct Structure From Air Preheater Out To Chimney Inlet In Boiler Unit No. 3 At Sikka Tps.
Works Of Ultrasonic Testing, Scrapping And Painting With Necessary Repairs Of 30 Mtr Boiler Chimney At Deonar Abattoir
Painting Of Chimney Of Boiler, Cyclone Separator, Foundation Of Boiler And 02 Nos. Storage Tank Cap 30Kl. In This Factory At Boiler House
Painting Of Chimney Of Boiler, Cyclone Separator, Foundation Of Boiler And 02 Nos. Storage Tank Cap 30Kl. In This Factory At Boiler House
Gem Bids For 2 Painting Of Boiler Chimney At Bh-2 Height Of Chimney-154ft. Base Od-6.56ft. Top Od. -2.62ft. Total Painting Of Boiler Chimney At Bh-1 Height Of Chimney-183ft. Base Od-9.45ft. Top Od. -3.28ft. Total