Supply Of Spares For Stg & Bop Of Gmdc’S 2X125 Mw Akrimota Thermal Power Station
Supply Of Bop Air Cooled Dry Type Power Transformer
Cleaning work of various auxiliaries of TG & BOP area of 1x800 MW Unit No.8 of Wanakbori TPS
Construction Of 01 No Surveillance Cum Op Point G 2 01 No Surveillance Cum Op Point G1 And 01 No Acp Shelter In Aor Of Bop Ah Para And Arup Of 39bn Now 173 Bsf Under Shq Bsf Teliamura.
C O Temporary Structure Jawan Barrack At Bop Madanghat Fwd Of 149 Bn Bsf Under Shq Bsf Berhampore Determined Work
C O Temporary Structure Jawan Barrack At Bop Nirmalchar Of 149 Bn Bsf Under Shq Bsf Berhampore Determined Work
C/O Temporary Structure Toilet Block At Bop Nirmalchar Of 149 Bn Bsf Under Shq Bsf Bhp Determined Work
Construction Of Balance Bfl Work Along Ibb From Bp No. 1301/4-S To 1316/M Bop Huroi And Hangaria For The Length Approx 10.30 Km In The State Of Tripura
Construction Of 08 Bedded Mahila Barrack At Bop Rajuwala Of 92 Bn Now 20 Bn Bsf Under Shq Bsf Jsmr North
Affidavit As Per Nit Co Surveillance Cum Op Shelter In Aor Of Bop R K Toba G 2 01 No Along With Indo Pak Border Of 92 Bn Bsf Under Shq Bsf Jsmr N