Earth Work, P.c.c Work, R.c.c. Work, C.c. Block Pitching, Brick Soling, Wbm-3 Etc 2nd Call. Replacement Of Bailey Bridge By Rcc Double Cell Box Culvert 8.00m X 7.00m, Carriageway Width 7.50m Without Footpath At Anandabazar Ch. 0.570 Km On The Road From Kanchanpur To Dasda Road Under Dasda Sub-division, Pwdrnb During The Year 2025-26
Restoration Work From Km 0.000 To Km 4.000 Of Taura Scape And Brick Edge Soling Work From Km 1.200 To Km 4.000 Of Bai Patari
Brick On Edge Soling Work On The Right Track Between Km 170.100 To Km 200.000 Of Hardoi Branch
Brick On Edge Soling Work On The Left Bank Between Km 0.000 To Km 14.400 Of Maurava Canal
Brick On Edge Soling Work On Various Riches On The Left Bank Of Asiwan Branch
Relaying Of Brick Soling Work After Earthwork In Restoration Of Bhatpar Dy. Between Km 2.430 To Km 3.550 And Between Km 9.300 To Km 11.080
Repair Of Brick Soling Work From Km. 7.500 To Km. 7.850 Of Bokta Barwar
Repair Of Brick Soling Work From Km. 13.300 To Km. 13.900 Of K.s.s.
Repair Of Brick Soling Work From Km. 13.300 To Km. 13.900 Of K.s.s.
Repair Of Brick Soling Work From Km. 7.500 To Km. 7.850 Of Bokta Barwar Embakment At Right Bank Of River Rapti