Strengthening Of Road From Katanga Tiraha To Choti Line Fatak Road Length 1.60 Km. With Cable Duct And Construction Of Drain, Underground Ht/Lt Line And Illumination Work. 1St Call
Construction Of Foundations, Cable Trench & Misc. Civil Works At 66 Kv Sanosara, Hamapar And Khengaraka, Neknam And Khodapipar S/S For Downstream Network Of 220Kv Rupavati S/S Under Gondal Circle.
Optical Fiber Cable Construction/ofc Laying At Chandni, Kukda And Khajuri 4 G Saturation Bts Work
The Comprehensive Construction Of Adss Of Cable Including Supply And Installation Of Related Adss Of Cable Accessories, Supply And Erection Of 7M 8M Tubular Poles Along With Associated Accessories, Slinging Of Adss Cable, Testing And Commissioning
Construction Of Rcc Cable Trenches, Pathways, Surface Drain, Development Of Switchyard And Other Ancillary Civil Works For Capacity Augmentation At Goaljan 33/11 Kv Sub Station Under Kandi Division, Dist- Murshidabad.
Optical Fiber Cable Construction Works Pan India As And Where Basis Tender Document For Optical Fiber Cable Construction Works Pan India As And Where Basis
1. Secunderabad Division- Ink Kdm Section - Signal Cable Shifting For Proposed Construction Of New Bridge No. 569a (aditional Vent Way) At Km 430/10-12 Up&dn Line Portion As Precasted Rcc Box Between Taa - Kdm Stations By Air Pushing Method. 2. Secunderabad Division- Ink Kdm Section - Signal Cable Shifting For Proposed Construction Of New Bridge No. 569b (aditional Vent Way) At Km 430/18- 20 Up&dn Line Portion As Precasted Rcc Box Between Taa - Kdm Stations By Air Pushing Method. 3. Secunderabad Division- Ink Kdm Section - Signal Cable Shifting For Proposed Construction Of New Bridge No. 574a (aditional Vent Way) At Km 433/2-4, Up&dn Line Portion As Precasted Rcc Box Between Taa - Mabd Stations By Air Pushing Method. 4. Secunderabad Division- Ink Kdm Section - Signal Cable Shifting For Proposed Construction Of New Bridge No. 574b (aditional Vent Way) At Km 433/6-8, Up&dn Line Portion As Precasted Rcc Box Between Taa - Mabd Stations By Air Pushing Method. 5. Secunderabad Division- Ink Kdm Section - Signal Cable Shifting For Proposed Construction Of New Bridge No. 550a (aditional Vent Way) At Km 418/6-4 Up&dn Line Portion As Precasted Rcc Box Between Ink - Kdm Stations By Air Pushing Method. 6. Secunderabad Division- Ink Kdm Section - Signal Cable Shifting For Proposed Construction Of New Bridge No. 548 (aditional Vent Way) At Km 418/2-4 Up&dn Line Portion As Precasted Rcc Box Between Ink - Kdm Stations By Air Pushing Method. 7. Signalling Cables Shifting In View Of Proposed Construction Of Lhs New Bridge No. 559a At Km No 421/33-35 In Liew Of Closed Level Crossing At Kdm Station Yard As Precast Rcc Box By Air Pushing Method.
Laying Of 33Kv Ug Cable In Connection With Construction Of 33Kv Substation, Puzhakkal
Construction Of Foundation And Plinth Of Ptr Ct Vcb Station Service Transformer And Construction Of New Bay Cable Trench Pathway Control Room Outside Painting And Other Allied Civil Works At Ismile 33 11 Kv Sub Station Under Asansol Division Rm/Pbdn/Civil/Nit/2025-26/13 Dt.13.11.25
Construction Of Iconic Hybrid Cable Stayed And Suspension Bridge Across Krishna River On Nh -167K Design Chainage Km 87.360 To Km 88.437 In The States Of Telangana And Andhra Pradesh On Engineering, Procurement And Construction Epc Basis