Execution Of All St Works Including Supply Of Materials Under Schedules C D E Including Trenching Ducting Cable Laying Jointing Installation Earthing Testing And Commissioning For Jharkhand And Odisha \
Installation Of Mv Cable Trenching, Solar Cable And Ldvc Cable Laying, Mv Termination And Glanding Etc As Per The Approved Drawings And Plans At Bisha Pv Solar Plant As Per The Approved Guidelines And Specifications Of The Client Eoi Document For Selection Of Subcontractors In The Field Of Mv Electrical Work For The Bisha Pv Solar Project Kingdom Of Saudi Arabia
Project Consists Of Installation Of Lv Cable Trenching, Solar Cable And Ldvc Cable Laying, Lv Termination And Glanding Etc As Per The Approved Drawings And Plans At Bisha Pv Solar Plant As Per The Approved Guidelines And Specifications Of The Client Eoi Document For Selection Of Subcontractors In The Field Of Lv Electrical Work For The Bisha Pv Solar Project Kingdom Of Saudi Arabia
Gem Bids For 250 Kva Dg Set With Exhaust System, Amf Control Panel, Lt Power Cable Outdoor 3 And Half Core 300 Sq Mm, Ltcable Indoor 3 And Half Core 400 Sq Mm Al, Control Cable, Cable Laying Trenching, Hdd, Earthing Gi Chemical Pipepits, Civil Works Pcc Foundation, Pre-commissioning Testsdocs, Buyback Of Old 65 Kva Dg Set
Design,manufacture, Supply, Installation, Programming, Testing And Commissioning Of Electronic Interlocking (ei) System By Oem Conforming To Attach Tentative Signalling Planned Rdso Specification As Per Rdso/spn/192/2019 Ver. 2.0 With Latest Amendments And Supply Of Indoor And Outdoor Signaling Materials ,trenching , Cable Laying, Termination Of S&t Cables Of Various Cores Complete For Indoor And Outdoor Works Of Sandasal Station Along With Alteration /modification At Two Stations At Samlaya And Timba Road In Connection With Guge Conversion From Ng To Bg Between Samlaya - Timba Road (53.5 Kms) On Varodara Division Of Western Railway
Execution Of In-Campus Last Mile Optical Fibre Cable Laying Through Open Trenching/ Hdd Method And Associated Work Including Supply Of Allied Materials In Meghalaya State For Last Mile Connectivity Of Indian Air Force Iaf For Railtel Corporation Of
Execution Of In-Campus Last Mile Optical Fibre Cable Laying Through Open Trenching/ Hdd Method And Associated Work Including Supply Of Allied Materials In Bihar State For Last Mile Connectivity Of Indian Air Force Iaf For Railtel Corporation Of Ind
Execution Of In-Campus Last Mile Optical Fibre Cable Laying Through Open Trenching/ Hdd Method And Associated Work Including Supply Of Allied Materials In West Bengal State Njp Territory For Last Mile Connectivity Of Indian Air Force Iaf For Rail
Execution Of In-Campus Last Mile Optical Fibre Cable Laying Through Open Trenching/ Hdd Method And Associated Work Including Supply Of Allied Materials In West Bengal State Kolkata Territory For Last Mile Connectivity Of Indian Air Force Iaf
Execution Of In-Campus Last Mile Optical Fibre Cable Laying Through Open Trenching/ Hdd Method And Associated Work Including Supply Of Allied Materials In Assam State For Last Mile Connectivity Of Indian Air Force Iaf For Railtel Corporation Of Ind