Removing Of Old Unused Control Cable From Cable Gallery And Tunnel Trenches At 400 Kv Substation Panki
Maintenance Of Tunnel Lighting, Cable Tray, Wiring, Substation Etc. Between Lmg- Bpb Section For 730 Days Under Sse/p/bpb & Sse/p/lmg.
Supply of 10 Control Panels For Cable Tunnel Vs
Repair Of Mat Pavement At Entrance Of Adit To Pressure Shaft Surge Gallery And Proper Drainage Of Seepage Water In Cable And Ventilation Tunnel At Power House Elagad
Replacement Of Fluorescent Lights With Led Lights At All Floors Ventilation Tunnel Cable Tunnel And Pothead Yard
Supply of 2 Cable Harness Sections Tunnel & Les Cables
Renovation Of Pts Cable Tunnel And Substation -C At Iprc
Cable Management In Tunnel Section.
Construction Of Upper Rock Fill Dam, Lower Concrete Gravity Main Dam, Lower Rock Fill Saddle Dam, Coffer Dam, Power Intake, Headrace Tunnel, Penstock Tunnel And Shaft, Underground Power House And Gate Chamber, Tailrace Tunnel & Shaft, Switchyard & Cable Tunnel, Adit Tunnels, Service Road And All Other Incidental Works For Implementation Of Turga Pumped Storage Project I 4X250 Mw At Ajodhya Hills, Block- Baghmundi.
Upgradation Of Existing Lighting System To Led Lighting System By Supplying And Fixing Of Led Flood Lights Along With Cable At All Tunnel Conveyors And Street Light Poles And Point Poles Of Odph At Chp And Providing Welding Supply Points At Jts, Conveyors And Crusher Houses Of Chp-1 & 2 Of Rtps.