Providing Services For Canal Operation And Irrigation Management In The Command Area Of Ukai Left Bank High Level Canal Ch.0.0 Mt To Ch.28940 Mt.
Modernisation Of Bhojapur Left Bank Canal Including Dy-3 Of Dodi Branch, Hpd Repairs Earthwork, Lining And Structures
Construction Of Distribution System Through Pipe Distribution Net Work P.D.N. For Dhom Balkawadi Right Bank Canal Km 128 To 147 Tal. Phaltan And Dist. Satara.
Repair Of Slipped Portion Of Right Side Canal Bank Between Rd 20.00 Km To 25.00 Km Right Bank Main Canal.
Carrying Out Necessary Repairs And Restoration Works For Ghod Right Bank Canal In Km 0 To 30 And Left Bank Canal In Km 0 To 73 As Well As Its Selected Distributaries, Also Carrying Out Allied Works Under Maharashtra Irrigation Improvement Programme.
Canal Bank To Mv-50 Road Sdbc, Both Side Berm, Road Singage, Hot Applied Thermoplastic 0/000 To 0/660
Construction Of Additional Structures Patch Lining And Tailing Of Minor Ml5 At Rd 26085M And Its Sub Minors, Minor Ml6 At Rd 26632 M And Its Sub Minors On Gosikhurd Right Bank Main Canal.
Patch Lining And Tailing Of Distributory D-2 And Its Minors And Subminors Offtaking At Rd 21770 M On Gosikhurd Right Bank Canal.
Kukadi Irrigation Project, Dist.Pune, Ahilyanagar Balance Repair Works Of Kukadi Left Bank Canal K.M. 0 To 59 Under Maharashtra Irrigation Improvement Programme Miip.
Improvement Of Existing Irrigation Infrastructure Works On Kakarapar Left Bank Main Canal At Ch.51401.00 Mt (village Road Bridge)