Complete Dewatering And Clearing Of
Ttps Mech Ii Tm I Stage I Ii Maintaining The T G Equipments Kept At Repair Bay Free From Debris Dust And Clearing Coal Ash Dust From The Repair Bay Floor For The Period From 01 04 2026 To 31 03 2027
Ichp- Clearing The Juliflora Jungle Without Uprooting, Construction Of Rcc Pedestal Cleaning And Painting Of Cable Tray Support Structures And Columns Located From Chs-V To Tt-4
Handling Clearing And Transporting Of Materials From In And Around Tuticorin To Central Stores Ttps And Its Related Works For Period From 01.04.2026 To 31.03.2027 Excluding Holidays Or From The Date Of Entrustment Of Work To 31.03.2027
Ooclearing Light Jungle Growth With Out Felling Trees At Govt. Timber Depot Compound Kothamangalam For Stacking Timber During 2026-27 Estimate For The Cost Of Clearing Light Jungle Growth With Out Felling Trees At Govt. Timber Depot Compound Kothamangalam For Stacking Timber During 2026-27
Gem Bids For Cleaning, Sanitation And Disinfection Service - Outcome Based - All Public Areas Clearing Of Storm Drains Common Areas Of Building Cleanship All Room Inside; General Cleaning (sweeping, Mopping, Dusting); All Public Areas Clearing Of Storm Drains Com.. , Collection & Disposal Waste Management Service - Collection, Lifting, Transportation, Unloading, Segregation Of Garbage, Ways Of Disposal; Dry Waste , Horticulture Service - Maintenance Based Model - Service With Known Quantity Of Consumables; General Maintenance Of Garden/lawn/field/nursery/park
Ttps Operation Circle Mpm I Unit Ii Collecting Of Coal Rejects From The Mill Chute, Dumping In The Specified Area, Clearing The Same, Loading, Transporting And Dumping In A Specified Area Of Ttps For A Period From 01.04.2026 To 31.03.2027
Ttps Mech Ii Tm Ii Unit Iv V Clearing The Coal Ash Dust From The 0Mtr Repair Bay Floor Turbine 5Mtr 7 5Mtr 10 5 Mtr Floor Area Condenser Pit Sump Pit Cleaning Work For The Period From 01 04 2026 To 31 03 2027
Ichp -Clearing The Slided And Spilled Coal Along The Walkways Over Below Deck Sheets, Between The Track Rails And Outside The Track Rails Both North South Sides Of Stacker-Ii And Reclaimer-Ii Machine Travel Path In Conveyor-54.
Transportation Of Condemned/scrap Elastic Rail Clips(erc) By Road.the Above Work Involves Other Intermediary & Ancillary Activities Such As:(1)collection Of Condemned/scrap Elastic Rail Clips Available From Various Railway Locations (2)clearing And Separating Any Kind Of Material/objects Attached To Erc.(3)loading The Collected Condemned/scrap Elastic Rail Clips Into The Vehicle Deployed By The Contractor. The Contractor Shall Load Only Those Ercs Which Are Free From Rubber Components Or Any Other Kind Of Attachments Before Loading. (4)transportation Of Condemned/scrap Elastic Rail Clips Which Are Free From Rubber Components Or Any Other Kind Of Attachments, From Various Railway Locations To Rail Wheel Factory, Yelahanka, Bengaluru- 560064. (5)unloading At Destination, By Railways At Free Of Cost. Quantity: 3600mt. Distance Slab: 0-500kms(with A Minimum Chargeable Distance Of 100kms).special Note: (1) Tenderers Should Quote The Rates Based On The Diesel Price Of Rs.90.99 Per Litre Prevailing At Bengaluru As On Estimation Date I.e.03.10.2025 And The Same Shall Be Considered For The Purpose Of Evaluation. (2)mandatory Documents Should Be Submitted In Compliance Of: Bid Security Conditions Including Annexure-vi(a), Annexure-v, Annexure-v(a), Annexure-vi(b), Power Of Attorney And Iba Certification. (3) Non-submission Of Necessary Documents In Support Of The Above May Result In Rejection Of Bids.