Work Contract For Routine Maintenance Of 8.5 E 9 Abb Abl Coal Mill 14 Nos. And Its Auxiliaires And Transportation Of Mill Reject Coal Dust Raw Coal Mill Area To Coal Yard At Unit 3 And 4, At, Sgtps, Mppgcl, Birsinghpur
Clearing The Drain Free Of Coal Dust, Silt, Slush, Debris Etc. In And Around Primary Crusher House 1 And 2, Transfer Towers 2 And 7 And Junction Tower 20 For The Period From 01.04.2026 To 31.03.2027
The Work Of Removing Compacted Soil, Coal Dust, Mud Stones Etc. From Below The Platform Of Weighbridgeiiand Engagement Of Manpower For Handling/carrying Of Cicast Iron Test Weights Of 09 Nos. Of Road Weighbridge Under Sijua Area
Cleaning And Scraping Of Coal Dust And Coal Muck From Bankibahal Chowk To Siarmal Chowk At Kulda Ocp Of Ba
Echp-Ii Clearing The Coal Coal Dust And Foreign Materials Daily On Walkways Of Both Side Return Side Under Belt Throughout Conveyors Deck Sheet And Tail End Areas Monitoring Cleaning And Checking The Mechanical Equipments Of Conveyor 72 73 .
Ttps Es Em Ii Unit Ii Charges For Routine Cleaning Of Fly Ash And Coal Dust From The Cable Trays And Cable Ducts In And Around Boiler Area And Mill Area Etc And Routine Cleaning Minor Maintenance Work Of Boiler Side Fan Motors Mill Motors Lub Oil
Ttps Es Circle Em Iii Routine Cleaning Of Fly Ash And Coal Dust In The Ht Fan Motors Mill Motors Cable Trays In Unit Iv V For A Period Of Twelve Months From 01 04 2026 To 31 03 2027
Ttps Es Em Ii Unit I Charges For Routine Cleaning Of Fly Ash And Coal Dust From The Cable Trays And Cable Ducts In And Around Boiler Area And Mill Area Etc And Routine Cleaning Minor Maintenance Work Of Boiler Side Fan Motors Mill Motors Lub Oil M
Ttps Es Em Ii Unit Iii Charges For Routine Cleaning Of Fly Ash And Coal Dust From The Cable Trays And Cable Ducts In And Around Boiler Area And Mill Area Etc And Routine Cleaning Minor Maintenance Work Of Boiler Side Fan Motors Mill Motors Lub Oil
Ttps Mech Ii Tm I Stage I Ii Maintaining The T G Equipments Kept At Repair Bay Free From Debris Dust And Clearing Coal Ash Dust From The Repair Bay Floor For The Period From 01 04 2026 To 31 03 2027