Hopper Cleaning And Breaking Of Oversize Coal/ Stone Boulders Over Hopper Mesh Of Wagon Tippler Of Coal Handling Plant, B Tps Obra
Chipping In Stone, Coal, Construction Of Isolation Stoppings, Air Crossings And Other Masonery Works At Ik-1a Inclines, Srp Area For A Period Of Three Years As Per The Scope Of Work, Terms And Conditions Of Nit
Outsourcing Of Chipping In Stone, Coal, Construction Of Isolation Stoppings, Air Crossings And Other Masonery Works At Ik-1a Inclines, Srp Area For A Period Of Three Years As Per The Scope Of Work, Terms And Conditions Of Nit
Gem Bids For Coal Drill Bit, Stone Drill Bit, Drill Rod
Procurement Of Coal And Stone Drill Bits And Drill Rods For Roof Bolters On Rate Contract For 2 Years.
Picking Of Shale Stone, Oversize Coal And Foreign Material From The Coal On Running Conveyor Belts Running At The Speed Of Around 3.5metres Per Second Pertains To Stage-3 & 4 Of Chp, Transport Of Shale To Dump Yard Within The Premises Of Chp Distance: 0 To 5 Km And Cleaning Of Drains At Crushed Stock Yards Of Stg-3 & 4 As And When Required During The Period From 01.04.2025 Or Commencement Of The Work To 31.03.2026
Picking Of Shale Stone, Oversize Coal And Foreign Material From The Coal On Running Conveyor Belts Running At The Speed Of Around 3.5metres Per Second Pertains To Stage-1 & 2 Of Chp, Transport Of Shale To Dump Yard Within The Premises Of Chp Distance: 0 To 5 Km And Cleaning Of Drains At Crushed Stock Yards Of Stg-1 & 2 As And When Required During The Period From 01.04.2025 Or Commencement Of The Work To 31.03.2026
Construction Of Bund For Collection Of Ash With Reject Coal Stone Near By Ash Slurry Discharge Line Of Ahp-iv Stps Sarni.
Removing Of Silt, Slush, Debris, Etc. In 1370E Road, Around Rejected Coal Stone Yard, Around Sch 2 Building And Along 457.5E Road Drain Up To Cross For The Period From 01.04.2025 To 31.03.2026
Drivage Along Stone Floor And Shelly Coal Roof For Cm Marching Route In Rvi Seam