Providing Relaying Jointing Testing Commissioning Of Outfall Sewer Line For 1.32 Km From Last Manhole To 1.82 Mld Stp Pipes Along With Construction Of Machine Hole Chambers And Road Restoration Through Design Build And Transfer
Instalation Of Cold-Water Machine And Construction Of Machine Room At Khana Para At Hirannyagram Village Under Hirannyagram Sansad Under Paratal-I Gram Panchayet Under Jamalpur Development Block
Provision Of S&t Work In Connection With Jhansi-bina & Parauna-kanpur- Construction Of Track Machine Stabling Siding
Bengaluru Division: Sw-i: Ynk-bwt Section: Proposed Extension Of Rub Bridge No. 75-a At Railway Km 102.917 In Srinivasapura Station Yard (exg 2 X 7.5m X 5.5m (twin Rcc Boxes), Proposed Extension As 2 X 7.5m X 5.5m (twin Rcc Boxes) - 13m) In Connection With The Work Of Track Machine Siding. Sw-ii: Construction Of Track Machine Siding Of 250m Length At Svs Station In Connection With The Work Of Construction Of Track Machine Siding For A Length Of 420m At 15 Minor Stations In Sbc Division. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
New Construction Of Machine Hole In Ward No.28.
Jhansi-khairar, Khairar-bhimsen And Mahoba -khajuraho Section -construction Of Track Machine Siding
Construction Of Track Machine Siding At Smet, Srf, Kmsi, Cmgr, Shyp, Momu & Rnr Stations - (7 Nos.)
Strengthening And Extension Work Of Storm And Sewer Line Including Construction Of Machine Holes As And When Required In Various Areas Of Sub Zone 2 At South West Athwa Zone.
Telecom Work In Connection With Provision Of Facility For Tmc Staff Including Transit Accommodation & Ancillary Works For Track Machine Staff & Construction Of Rpf Barracks At Bnlw And Sikr Stations Of Jaipur Division.
Providing And Laying Drainage Line Construction Of Machine Hole Chamber At Shahibaug Area Diff. Places Under Swarnim Jayanti Yogana And Other Budget In Shahibaug Ward.