Design Engineering Manufacture Supply Installation Testing And Commissioning Of Parallel Conveyors No 315n31 315n32 To 315n2 With Junction Houses 315n3jh01 315n3jh02 At Bailadila Iron Ore Mine Mv Siding Area At Kirandul Complex
Supply Of Jack Shaft For Cope F.r.conveyors
Supply Of Air Oil Coolers Radiators For Conveyors, Wagon Tipplers And Secondary Crushers At Chp, Csctpp
Replacement/reconditioning Of Idlers And Idler Frames Of Conveyors At Q10 Berth, W. Island, Fact-cd
Gem Bids For Assembly Fluid Coupling Fcu 17.75 For Conveyors Et11/1 12/1 Mfr. Pembril Fluid Drive Premium Energy
Gem Bids For Operation And Maintenance Of Other Machines And Plants -cleaning Of Coal Dust, Coal Slurry And Spilled Out Coal Fromall The Conveyors And Clearing Of Entire Plant Including Drivehouses, Transfer House, Walkways/ Catways, Jammedtransfer Chutes, Tr.
Procurement Of 6 Core Pull Wire Cable For Development Of Belt Conveyors Of Alp Mine
Procurement Of Epfr Conveyor Belts For Belt Conveyors Working In Coal Handling Plant At Stpp, Jaipur
Procurement Of Idlers / Rollers For Belt Conveyors Working In Coal Handling Plant At 2x600mw Stpp, Jaipur
Removal Of Spilled Over Coal, Fine Dust And Wet Coal At Bcn-3ab Tunnel, Fg Floor At Tp-2, Ground Portal, Gallery And Head End Areas And Contingency-1 And 2 Area Of 3ab Including Fg Floors And Reclaim Belt Conveyors And Reclaim Chain Feeders By Head Loads On To Running Conveyor Required In Mm/chp/btps From 01.12.2025 Or Actual Date Of Commencement Of Work To 31.03.2026.