Sh Formation Cutting Retaining Structures Cross Drainage Paver Blocks Vshape Side Drain Road Side Drain Road Side Essential Parapets Road Signages And Dumping Sites In Km 0/0 To 5/205 Under Nabard Ridf Xxxi I/c 5 Years Maintenance Construction of Link Road From Dhaned To Talasi Via Shiv Nagari Km 0/0 To 5/205
Sh Removal Of Formation Deficiency C O R Wall Gabions Wall Mt Works Cc Pavement Pcc U V Shape Drain Cross Drainage Work Road Furniture From Km 0 000 To 12 195 Including 5 Years Maintenance Up Gradation Of Tikker Manoh Via Jakhyol Ramhera Sulkhan Dhirwin Road Km 0 000 To 12 195 Under Nabard Ridf Xxx
Construction Of Cross Drainage Work Near The House Of Saresh Roy, Part No 20/262, , Work Id - 110841668, Under Chapadanga Gp, Kranti Block Enit-03/Cpgp/2025-26/Sl-08
Construction Of Formation Cutting, Protection Work, Cross Drainage Work, V-shape Drain, Metalling And Tarring, Road Furniture And Dumping Structure In Km 0/00 To 12/730 Portion 6/00 To 12/730 Under Nabard Ridf-xxxi Up- Gradation Of Badiyara To Dhakgaon Village Road Km. 0/0 To 12/730
Providing Cross Drainage In Keezhakazhani In Manamai Panchayat At Thirukkazhukundram Panchayat
Providing Cement Concrete Drainage And Cross Drainage 1.5 M Span At Ambethkar Street In Nerumbur Panchayat At Thirukkazhukundram Panchayat Union.
Construction Of Cross Drainage Works Including Laying Of Rcc Hume Pipe Over The Rinchingtong Khola. 66/1/Dm/Niet/Ee/Ded/Gta/25-26
1.Construction Of Cross Drainage Culvert In Main Road Sozhakattu Village At Parameswaramangalam Panchayat In Lathur Panchayat Union. Estimate.5.00 Lakhs, 15Th Finance Bp Tied/2025-26
Emergency Road Work On Various Roads Under Porbandar R & B Division Construction Of New Cross Drainage Work, Repairing Of Cross Drainage, Structure Work, Labour & Machinery Work, Construction Of New Bridge Work & Other Misc. Work 4Th Attempt
Rofd, R/Wall, B/Wall, Cross Drainage, P/L Gsb, Wmm, Metaling Tarring, Cement Concrete Pavement, Interlocking Tiles, Side Drain, Parapets Sign Boards In Km. 0/00 To 8/00 Under Nabrd Xxxi Including 5 Year Maintenace Construction Of Balyali To Sandapattan Road Km. 0/00 To 8/0