Improvement Of Ballygunge Yard And Budge Budge New And Old Yard By Casual Renewal Of Rails, Fittings, Fsto Sleepers, Ttr, Deep Screening, Packing, Skv Welding, Rail Painting And Other Ancillary Works Under Senior Section Engineer[p. Way]/beliaghata In The Jurisdiction Of Assistant Engineer/ballygunge Under Divisional Engineer[hq]/sealdah.
Pre And Post Attention Work In C/w Deep Screening By Sbcm/frm And Other Track Works In C/w Sanctioned Work Of Ttrs Under Aden/sir & Rpj In The Section Of Sr. Den-iv/umb.
(i) Through Sleeper Renewal (primary){tsr(p)} By Pqrs Machine/manually Including Deep Screening Work By Bcm/manually, Execution Of Cess Repair, Construction/repair Of Drain & Other Miscellaneous P-way Related Works For 22.650 Tkm In Padapahar -nayagarh & 7.586 Tkm In Barajamda Jn. - Bolanikhadan Section. (ii) Through Sleeper Renewal (primary){tsr(p)} By Pqrs Machine Including Deep Screening Work By Bcm, Execution Of Cess Repair & Other Miscellaneous P-way Related Works For For 2.850 Tkm In Rajkharsawan Jn. - Padapahar (dn) Section, Under The Jurisdiction Of Sr. Den(south)/ckp.
Name Of The Work: Secunderabad Division - Sw-i:kzj-ki Section-tsr(p) Of Exg. Psc6 Sleepers 1660nos/km Density With New 60kg/90uts Rails On Psc6 Wide Sleepers 1660 Nos./km Including Recoupment And Increasing Of Ballast Cushion To 35 Cm. And Deep Screening Of Ballast For A Total Length Of 31.133 Kms As Per Annexure. Sw-ii:kzj-ki , Dkj-mugr & Mtmi-jnpd Sections - Ctr(p)-15.159 Tkm On Passenger Running Loop Lines, Sw-iii:kzj-ki Section-ctr(p) Of Exg. 52kg/60kg/72uts/90uts Rails On Psc5 Sleepers 1660nos/km Density With New 60kg/90uts Rails On Psc6 Wide Sleepers 1660 Nos./km Including Recoupment And Increasing Of Ballast Cushion To 35 Cm. And Deep Screening Of Ballast For A Total Length Of 1.000 Kms As Per Annexure, Sw-iv: Kzj-ki Section-provision Of Pqrs Sidiing Lines At Ygl Station, Sw- V:kzj-ki Section-bridge No. 517 Dn Existing 1x0.60m Rcc Slab At Km 396/1-3 Between Kazipet - Nekonda Stations Proposed To Be Extended As As Rcc Box Of Size 1x1.20x1.60m (cast-in-situ), Sw-vi:kzj-ki Section-bridge No. 518 Dn Existing 2x3.89m + 1x3.70m Rcc Slab At Km 396/14-16 Between Kazipet - Nekonda Stations Proposed To Be Extended As 2x6.10m Psc Slab.
Kota - Makholi Section- Subsidiary Work With Deep Screening By Bcm - 11.230kms (up/dn) (balance Work).
(i) Through Sleeper Renewal (p) Of 41.217 Tkm By Track Renewal Train (trt), Deep Screening By Bcm And T-28 And Other Miscellaneous Works Under The Jurisdiction Of Sr.den(east)/ckp In Chakradharpur Division. (ii) Through Sleeper Renewal (p) Of 4.903 Tkm By Track Renewal Train (trt), Deep Screening By Bcm And T-28 And Other Miscellaneous Works Between Tata-ond 286.00-290.903 = 4.903tkm. (iii) Through Sleeper Renewal (p) 11 Km Between Section Tata - Ond From Km 259-270 (by Track Renewal Train (trt) And Pqrs), Deep Screening By Bcm And T-28 And Other Miscellaneous Works.
Supply Of Cutter Bit Tungsten Carbide Tipped, Confirming To Plasser Part No. 64.08.2034-hm With Lock Washer Confirming To Plasser Part No. 64.08.2035 And Fixing Pin 8x40din1481 As Per Rdso Specification No. Tm/hm/6/435 And Rdso Drawing No. Rdso/tm/03/19. Warranty: 40km Of Deep Screening Or 30 Months From Date Of Supply Whichever Is Earlier. Acceptable Make:- Plasser Or Equivalent..
Secondary Tsr Of Loop Lines & Deep Screening Of Loop Line In Bgkt And Ju Yard In The Section Of Sse/pw/ju Under Aden/line
Manual Deep Screening 30.157 Km On Beas-tto Section, 9.140 Km On Vka-dbnk Section And 10.518 Km On Bat-qdn Section. (g. Total= 49.815 Km) In The Section Of Aden-i/ Asr & Aden-ii/ Asr.
P. Way Work In Connection With Yard Improvement And Upgradation Of Yards (at Bdc) Like Ttr -32 Set (ttr (fs+cs+cmsc)-1 In 12- 2 Set & 1 In 8.5- 25 Sets, Ttr (ds) -1 In 8.5-5 Sets , Tbr -9.139 Km ,tfr -.795 Km , Deep Screening , Lifting , Improvement Of Turn In Curve , Force Fit Layout And Other Ancillary Works Under Aen/bdc Under The Jurisdiction Of Sr.den/1/hwh