Engagement Of Consultant For Preparation Of Detailed Project Report For Construction Of Rest House At Langkoor Igoo.
Engagement Of Consultant For Preparation Of Detailed Project Report For Strengthening Of The Courtyard At Takthok Monastary Sakti.
Preparation Of Land Slide Mitigation Measure To Protect To Hill Slope On Jhandutta To Bharoli Kallan Road Near Mandwan Km. 6/500 To 7/0 Sh- Preparation Of Detailed Project Report Km. 6/500 To 7/500 Near Mandwan Bridge.
Consultancy Services For Preparation Of Cs For Preparation Of Detailed Project Report For 3 Nos Of Construction Of Vups At Ch Km 4.500 And Km37.500 Govindpur Chas Sect. Of Nh18 Old Nh32 And At Chkm19.700 Jaina More Location Of Nh320 Old Nh23 3Rd Call
Carrying Out Of Topographical Survey Works And Providing Technical Manpower In Connection With Preparation Of Technical Feasibility Detailed Project Report And Structural Design For Rob/rub Works Of Jabalpur - Gondia Section Of Nagpur Division Bandr/cs/71169/survey/01
Consultancy Services For Preparation Of Detailed Project Report Of 5.0 Km With Approaches Standalone Bridge Project Of Parshuram Ghat Section Realignment On Panvel-Mahad-Panji Road Nh-66 4L-6L-Ps In The State Of Maharashtra
Consultancy Services For Preparation Of Detailed Project Report For Widening To Four Lane With Paved Shoulder From Two Lane From Km.272.964 Anchatgiri To Km.287.463 Dharwad Cross And From Km.294.218 Kalghatagi To Km.300.00 Devikoppa Of Nh-52 In The
Engagement Of Consultant For Preparation Of Detailed Project Report For Construction Of Gyapa Chow Museum
Consultancy Services For Carrying Out Feasibility Study And Preparation Of Detailed Project Report And Pre-construction Activities For Alternate Highway Of Existing Highway Nh-110 From Siliguri
Preparation Of Detailed Project Report Comprising Of Technical Specification And Commercial Aspects For Establishment Of Grid Connected 45mw Ground Mounted Solar Plants That Is 7mw At Mhs Peddapally 8mw At Hps Nizamsagar And 30mw At Shankarpally And 4mw Floating Solar At Ktps Vii Stage Raw Water Reservoir And 8mw Roof Top Solar Plants That Is 6mw At Ktps Vii Stage And 2mw At Mhs Circle Tggenco