Providing And Fixing A Mechanical Valve Along With The Necessary Connection To The 800 Kl Elevated Level Service Reservoir Elsr At Municipal Pumping Station In Ichapuram Municipality
Job Work For Demolition And Dismantling Of Existing Elevated Service Reservoir Esr And Ug Sump With Pump Room At Kaliyabid Head Works Including Staging, Staircase, Foundation, Disposal Of Debris, Recovery Of Usable Materials, And Site Cleaning And Levelling Work
Kodinar Wss 4Th Invitation Under Amrut 2.0 : Working Survey, Soil Investigation, Design & Construction Of Water Treatment Plant, Clear Water Sump Cws, Pump House, Elevated Service Reservoir Esr, Compound Wall, Road Crossing, Supplying, Lowering, Laying And Jointing Di Pipeline For Clear Water Rising Main Pipeline And Providing, Supplying, Lowering, Laying And Jointing, Pvc Distribution Pipeline, Providing, Supplying, Erecting And Testing Of Pumping Machineries, Electrification Work Etc. At Various Head Works. Including Operation And Maintenance For 05-Years Including 03-Yeras Defect Liability Period For Kodinar Water Supply Scheme. Taluka: - Kodinar Dist.: -Gir Somnath, Gujarat
Construction Of Rcc Elevated Service Reservoir Esr Of 24 Lacs Litres Capacity 24 Mt. Staging Height At Dabholi Wds In North Zone Katargam, Surat.
Construction Of Rcc Elevated Service Reservoir Esr Of 27 Lacs Litres Capacity 24 Mt. Staging Height At Katargam Wds In North Zone Katargam, Surat.
Construction Of 60000 Litres Elevated Level Service Reservoir Oht With Pipeline At Ward Number 14 Uppupalayam Area In Padaveedu Town Panchayat, Namakkal District. Mlacds 2025 -2026
Providing And Laying Of 250mm Dia Di Class K9 Pipeline For Water Supply From Elevated Level Service Reservoir Elsr At Midc Butibori Industrial Area Nagpur To Mmlp Nagpur At Sindi Taluka Selu In Wardha Dist. In State Of Maharashtra On Epc Mode
Color Painting Works Of 11 Nos. Elevated Service Reservoir Constructed Under Amrut, Ph-i Ward No-04, 15, 20, 21, 23, 27, 29, 30, 31, 34 And 35 Within Rajpur-sonarpur Municipal Area. 04/ Ee /kd/w And S/kmda Of 2025-26 2nd Call
1 Providing & Laying 600 Mm Dia. Di Rising Main From Paneli Wtp To Picnic Center Elevated Service Rerservoir 2 Construction Of 25 Mld Water Treatment Plant, Ground Service Reservoir Gsr, Elevated Service Reservoir Esr, Zero Liquid Discharge Units & Other Misc. Work At Paneli Lake 3 Operation And Maintenance Of Pipeline, Wtp & Zld Including Clear Water Sump & Pump House And Esr For Two Years At Paneli Lake
Design, Survey And Soil Investigation For Construction Of Elevated Service Reservoir Esr, Rising Main Connecting To Existing Sump, Sitc Of Pumping Machinery And Distribution Network With Compound Wall At Maktampur Village For Bharuch City