Tender Bharat Website covers all Tenders for felt – Including felt Government Tenders, e Tender felt, felt Tenders and Private Tenders. There is no shortage of business opportunities from the largest felt Tender Database.
Our website allows you to find felt tenders online quickly and easily. Subscribers can also opt to receive daily tender alerts through email from TenderBharat.com to guarantee they don't miss out on any opportunities.
Gem Bids For 1869 Processed Jute Soft Needled And Proofed Ammunition 6.3mm Thick X 1320.8 Mm Wide To Specn: No.
Gem Bids For 6 Bearing Housing Saf-218 Grease Lub. - 90 Mm Dia. With V- Seal With 4 Nos. Fixing Hole. Four Hole
Supply Of Packing For Tm Blower Duct As Per S.c.rly Drg No.a4/el/wam4/1756, Alt-2.
Gem bids for 100000 Bitumen s For Water Proofing And Damp Proofing As Per Is 1322 Q3
Gem Bids For Spare Parts For Kg Khosla Creppelle Iac Ii, 52 Hp Piston Ring Dia F185 Hp Half Piston Hp Piston Assembly Moisture Rubber Ring For Oil Filter Valve Suction Cr 11 Safety Valve After Cooler Safety Valve Inter Cooler Safety Valve Hp Piston 35mm
Zone No. 38 Road Zone- Lc Gates, Station, Circulating Area, Station Approached Road, Colony Road, Workshop Road Etc. Under Aen/Hq Under The Jurisdiction Of Sr.Den/Hq/Hwh P.E. 30.06.2026. Description: Overall Percentage Above/Below/At Par Over The Rates Of Cpwd-Dsr-2021 Items Of Engineering Department On All Chapters With Up To Date Correction Slips Etc. Note: 1. The Tenderer Is To Quote Only One Rate Against The Tender. The Advertised Value Is The Departmental Assessed Value. 2. The Departmental Assessed Value/Advertised Value Has Been Chalked Out Considering At Par With The Basic Cost Of Cpwd-Dsr-2021 Items. This Denotes That Escalation Over The Basic Cost Has Been Considered In Firming Up The Assessed Cost For The Instant Tender. 3. For Firming Up The Assessed Cost/Advertised Cost Of This Zonal Tender, Contribution Of I Earth Work- 4% In Chapter No. 2, Ii Mortar- 2% In Chapter No. 3, Iii Concrete Work- 4% In Chapter No. 4, Iv Masonary Work- 4% In Chapter No.6, V Steel Work- 5% In Chapter No. 10, Vi Dismantling And Demolishing- 1% In Chapter No.15, Vii Road Work- 80% Only 4. During Execution, The Respective Schedules From The Above Mentioned Percentage May Be Varied, If Necessary Is , With The Approval Of The Competent Authority. Finance Vetting If Warraned, May Also Be Sought For In This Context. 5. The Above Instructions Are Only For Guidance To The Tenderers. Tenders Should Consider The Above Aspects While Quoting Rates. 7 Tenderers While Quoting Rates Should Quote The Rates % Above/Below/At Par W.R.T. The Assessed/Advertised Value, As Reflected Against The Respective Schedules, Considering Escalation And Effect Of Gst And Other Taxes As Applicable.
Zone No. 37 Road Zone- Lc Gates And Station Approach Road Etc. Under Aen/Bhp Under The Jurisdiction Of Den/4/Hwh. Description: Overall Percentage Above/Below/At Par Over The Rates Of Cpwd-Dsr-2021 Items Of Engineering Department On All Chapters With Up To Date Correction Slips Etc. Value Rs. 6500000.00 Note: 1. The Tenderer Is To Quote Only One Rate Against The Tender. The Advertised Value Is The Departmental Assessed Value. 2. The Departmental Assessed Value/Advertised Value Has Been Chalked Out Considering At Par With The Basic Cost Of Cpwd-Dsr-2021 Items. This Denotes That No Escalation Over The Basic Cost Has Been Considered In Firming Up The Assessed Cost For The Instant Tender. 3. For Firming Up The Assessed Cost/Advertised Cost Of This Zonal Tender, Contribution Of I Earth Work- 4% In Chapter No. 2, Ii Mortar- 2% In Chapter No. 3, Iii Concrete Work- 4% In Chapter No. 4, Iv Masonary Work- 4% In Chapter No.6, V Steel Work- 5% In Chapter No. 10, Vi Dismantling And Demolishing- 1% In Chapter No.15, Vii Road Work- 80% Only 4. During Execution, The Respective Schedules From The Above Mentioned Percentage May Be Varied, If Necessary Is , With The Approval Of The Competent Authority. Finance Vetting If Warraned, May Also Be Sought For In This Context. 5. The Above Instructions Are Only For Guidance To The Tenderers. Tenders Should Consider The Above Aspects While Quoting Rates. 7 Tenderers While Quoting Rates Should Quote The Rates % Above/Below/At Par W.R.T. The Assessed/Advertised Value, As Reflected Against The Respective Schedules, Considering Escalation And Effect Of Gst And Other Taxes As Applicable.
Zone No. 36 Road Zone- Lc Gates And Station Approach Road Etc. Under Aen/Rph Under The Jurisdiction Of Den/4/Hwh. Description: Overall Percentage Above/Below/At Par Over The Rates Of Cpwd-Dsr-2021 Items Of Engineering Department On All Chapters With Up To Date Correction Slips Etc. Value Rs. 6500000.00 Note: 1. The Tenderer Is To Quote Only One Rate Against The Tender. The Advertised Value Is The Departmental Assessed Value. 2. The Departmental Assessed Value/Advertised Value Has Been Chalked Out Considering At Par With The Basic Cost Of Cpwd-Dsr-2021 Items. This Denotes That No Escalation Over The Basic Cost Has Been Considered In Firming Up The Assessed Cost For The Instant Tender. 3. For Firming Up The Assessed Cost/Advertised Cost Of This Zonal Tender, Contribution Of I Earth Work- 4% In Chapter No. 2, Ii Mortar- 2% In Chapter No. 3, Iii Concrete Work- 4% In Chapter No. 4, Iv Masonary Work- 4% In Chapter No.6, V Steel Work- 5% In Chapter No. 10, Vi Dismantling And Demolishing- 1% In Chapter No.15, Vii Road Work- 80% Only 4. During Execution, The Respective Schedules From The Above Mentioned Percentage May Be Varied, If Necessary Is , With The Approval Of The Competent Authority. Finance Vetting If Warraned, May Also Be Sought For In This Context. 5. The Above Instructions Are Only For Guidance To The Tenderers. Tenders Should Consider The Above Aspects While Quoting Rates. 7 Tenderers While Quoting Rates Should Quote The Rates % Above/Below/At Par W.R.T. The Assessed/Advertised Value, As Reflected Against The Respective Schedules, Considering Escalation And Effect Of Gst And Other Taxes As Applicable.
Zone No. 32 Road Zone- Lc Gates And Station Approach Road Etc. Under Aen/Bdc Under The Jurisdiction Of Sr.Den/1/Hwh. Description: Overall Percentage Above/Below/At Par Over The Rates Of Cpwd-Dsr-2021 Items Of Engineering Department On All Chapters With Up To Date Correction Slips Etc. Value Rs. 5610000.00 Note: 1. The Tenderer Is To Quote Only One Rate Against The Tender. The Advertised Value Is The Departmental Assessed Value. 2. The Departmental Assessed Value/Advertised Value Has Been Chalked Out Considering At Par With The Basic Cost Of Cpwd-Dsr-2021 Items. This Denotes That No Escalation Over The Basic Cost Has Been Considered In Firming Up The Assessed Cost For The Instant Tender. 3. For Firming Up The Assessed Cost/Advertised Cost Of This Zonal Tender, Contribution Of I Earth Work- 4% In Chapter No. 2, Ii Mortar- 2% In Chapter No. 3, Iii Concrete Work- 4% In Chapter No. 4, Iv Masonary Work- 4% In Chapter No.6, V Steel Work- 5% In Chapter No. 10, Vi Dismantling And Demolishing- 1% In Chapter No.15, Vii Road Work- 80% Only 4. During Execution, The Respective Schedules From The Above Mentioned Percentage May Be Varied, If Necessary Is , With The Approval Of The Competent Authority. Finance Vetting If Warraned, May Also Be Sought For In This Context. 5. The Above Instructions Are Only For Guidance To The Tenderers. Tenders Should Consider The Above Aspects While Quoting Rates. 7 Tenderers While Quoting Rates Should Quote The Rates % Above/Below/At Par W.R.T. The Assessed/Advertised Value, As Reflected Against The Respective Schedules, Considering Escalation And Effect Of Gst And Other Taxes As Applicable.
Zone No. 31 Road Zone- Lc Gates And Station Approach Road Etc. Under Aen/Llh Under The Jurisdiction Of Sr.Den/1/Hwh. Description: Overall Percentage Above/Below/At Par Over The Rates Of Cpwd-Dsr-2021 Items Of Engineering Department On All Chapters With Up To Date Correction Slips Etc. Value Rs. 5610000.00 Note: 1. The Tenderer Is To Quote Only One Rate Against The Tender. The Advertised Value Is The Departmental Assessed Value. 2. The Departmental Assessed Value/Advertised Value Has Been Chalked Out Considering At Par With The Basic Cost Of Cpwd-Dsr-2021 Items. This Denotes That No Escalation Over The Basic Cost Has Been Considered In Firming Up The Assessed Cost For The Instant Tender. 3. For Firming Up The Assessed Cost/Advertised Cost Of This Zonal Tender, Contribution Of I Earth Work- 4% In Chapter No. 2, Ii Mortar- 2% In Chapter No. 3, Iii Concrete Work- 4% In Chapter No. 4, Iv Masonary Work- 4% In Chapter No.6, V Steel Work- 5% In Chapter No. 10, Vi Dismantling And Demolishing- 1% In Chapter No.15, Vii Road Work- 80% Only 4. During Execution, The Respective Schedules From The Above Mentioned Percentage May Be Varied, If Necessary Is , With The Approval Of The Competent Authority. Finance Vetting If Warraned, May Also Be Sought For In This Context. 5. The Above Instructions Are Only For Guidance To The Tenderers. Tenders Should Consider The Above Aspects While Quoting Rates. 7 Tenderers While Quoting Rates Should Quote The Rates % Above/Below/At Par W.R.T. The Assessed/Advertised Value, As Reflected Against The Respective Schedules, Considering Escalation And Effect Of Gst And Other Taxes As Applicable.