Gem Bids For 04 Mp Bullet Camera Ip , 64 Ch Nvr 4 Sata , Hdd 10 Tb , 06 U Rack , 02 U Rack , Poe Switch 04 Port , Media Converter , Fibber Box , Fibber Patch Cord , Fibber Liu , Electric Box 03 Socket , Fibber 06 Core , Electric Wire 1 Square Mm , Inverter 1k Watt With 150 Ah Battery , Hd Pipe , Pvc Pipe , High Temperature Resistant Optical Fibre Cable Or Cat6 Of 305 Mtr Out Door , Installation Charges , Annual Maintenance
Supply Of 24/48 Fibre Armoured Optical Fiber Cable Ofc Cable ..
Gem Bids For Cluster Outsourcing For Maintenance Of Landline Andbroadband Network Ofc Network - Optical Fibre Cable;Attending All Types Of Cable Faults /
Gem Bids For Cluster Outsourcing For Maintenance Of Landline Andbroadband Network Ofc Network - Optical Fibre Cable;Attending All Types Of Cable Faults, Schedule 1: Sla Ofcbased Route Maintenance Nashik Sla 1, Clusteroutsourcing For Maintenance Of Landline And Broadbandnetwork Ofc Network - Optical Fibre Cable; Attending Alltypes Of Cable Faults, Schedule 2: Sla Ofc Based Routemaintenance Nashik Sla 2, Cluster Outsourcing Formaintenance Of Landline And Broadband Network Ofcnetwork - Optical Fibre Cable; Attending All Types Of Cablefaults, Schedle 3: Sla Ofc Based Route Maintenance Dhuler1, Cluster Outsourcing For Maintenance Of Landline Andbroadband Network Ofc Network - Optical Fibre Cable;Attending All Types Of Cable Faults, Schedule 4: Sla Ofcbased Route Maintenance Dhule R2, Cluster Outsourcingfor Maintenance Of Landline And Broadband Network Ofcnetwork - Optical Fibre Cable; Attending All Types Of Cablefaults, Schedule 5: Sla Ofc Based Route Maintenancemanmad, Cluster Outsourcing For Maintenance Of Landlineand Broadband Network Ofc Network - Optical Fibrecable; Attending All Types Of Cable Faults, Schedule 6: Slaofc Based Route Maintenance Nandurbar /
Supply Of 24 Fiber Armoured Optic Fibre Cable.
Gem Bids For Adss Optical Fibre Cable For Laying Along Power Linealignments Q3 % % % % 3 3 0 0 /
Construction Of Masonry Protection Wall On Left Side Of River Jhelum Optical Fibre Cable At Veerwan Rd 173.15 Kms.
Gem Bids For Adss Optical Fibre Cable For Laying Along Power Linealignments Q3
Gem Bids For Sitc, Bid Number Gem2025b7022077 Dated 19-12-2025 Bid Document1 37 1 1 Outdoor Colour Dome Ptz Camera, Indoor Fixed Colourdome Camera, Varifocal Outdoor Fixed Ir Colour Bulletcamera, L2 Switch, L2 Switch Industrial Grade, 1G Sfpmodule, Rack Mountable Vms Server, Rack Mountableanalytics Server, Rack Mountable Nas Server -140 Tb, 8Port Kvm Switch, 65 Inches Led Display, 43 Inches Display, Workstation Including Operating System, Cctv Console, Speed Dome Controller Joystick, Vms Software Andrequired Camera Connection License, Frs Or Anpr Softwarewith Camera License, Vms Client Viewing License, Cctv 19Inches Equipment Rack 42 U, Cctv 19 Inches Weatherproofequipment Rack 9 U, 25 Mm Dia Pvc Conduit, Supply Ofarmoured Optic Fibre Communication Cable, Laying Ofarmoured Optic Fibre Communication Cable, Supply Of 40Mm Dia Hdpe Pipe, Laying Of 40 Mm Dia Hdpe Pipe Onsurface Or Recess Or Concelaed, Laying Of 40 Mm Dia Hdpepipe Direct In Ground, Supplying And Drawing Of 1 Run Ofutp 4 Pair Cat 6 Lan Cable, Supplying And Drawing Of 2 Runof Utp 4 Pair Cat 6 Lan Cable, Supplying And Drawing Of 3Run Of Utp 4 Pair Cat 6 Lan Cable, Hot Dipped Galvanisediron Cable Tray 100 Mm Width X 50 Mm Depth X 1.6 Mmthickness, Powder Coating M.S. Cable Tray Bends 100 Mmwidth X 50 Mm Depth X 1.6 Mm Thickness, 1.1Kv Grade, Power Cable Of 3 Core 1.5 Sq Mm, Laying And Fixing Of Upto35 Sq. Mm Clamped With 1Mm Thick Saddle, Laying Of Upto35 Sq Mm In Ground, Rj45 Io Faceplate With Gang Box Orbackbox, 6 Port Light Guide Interconnect Unit Liu, Sc Lcfiber Patch Cord-3 Mtrs, 15 Kva Online Ups, Lowimpedance Digital Grounding System 240Ka, 24 Ports Rj45patch Panel With Itegrated Surge Protection, Rj45 Surgearrestor Of Class D, 20 Mm Ms Flexible Pipe With Pvccoating, Excavation Of The Cable Trenches In Hard Rock, 25Mm X 5Mm Copper Strip From Earth Electrode, Copperbonded Rod With Low Carbon Steel, 6.0 Metre Hot Dipgalvanised Octagonal Pole, Installation, Integration, Testingand Commissioning Of The Complete System //Bid Details2 / 37
Optical Fibre Cable Constructions Works In Section-1 Of Bg East - Hoskote 48f Ofc Route