Work For Construction Of Fire Protection Wall Between 50 Mva 220/132 Kv Transformer T-3 And New 100 Mva 220/132 Kv Transformer T-4 At 220 Kv Substation Bbmb Kurukshetra
General-Court Complex Chengannur, Alappuzha- Additional Provision Works And Repair Of The Existing Fire Protection System - Work-Electrical Fire Fighting Work
Fire Protection And Detection Work In Critical Care Unit
Upgradation Of Existing Rrf/mcf Of Ward 25municipal Office Ward-installation Of Fire Protection System-general Civil Work-
Upgradation Of Existing Rrf/Mcf Of Ward 9 Nadayara-Installation Of Fire Protection System-General Civil Work-
Third-party Audit Of Ongoing Work Of Fire Detection And Protection System At Parichha Tps, Parichha
Third-party Audit Of Ongoing Work Of Fire Detection And Protection System At Btps, Obra
Third-party Audit Of Ongoing Work Of Fire Detection And Protection System At Parichha Tps, Parichha
Construction Of Partly G 4 Partly G 8 Storied Building Civil Work, Sanitary Plumbing Work, Fire Protection System Including Internal Electrification Work For Proposed New Govt. Polytechnic At Behala In Kmc Area Ward No. 132 Sitc Of Lightn Sitc Of Lightning Protection System At Behala Govt Polytechnic
Kishore Bharati Krirangan Kolkata Repairing Work For Fire Protection System Ee/Ksd/Pwd/ E-Niq-03/2025-26