Project Estimate For Construction/Reconstruction Water Courses Of Outlet With Fly Ash Rd 39555/R Of Moonak Branch
Transportation Of Dry Fly Ash From Ms Mettur Thermal Power Station, Unit-I And Ii Mtps, Mettur To Tnpl Cement Plant At Kagithapuram Through Bulkers
Transportation Of Dry Fly Ash Through Bulkers From Nlc Tamil Nadu Power Limited, Tuticorin To Ariyalur Cement Works
Supply Of Porous Tile For Esp Hoppers In Fly Ash System
Gem bids for Custom Bid For Services - Deployment Of Three Nos Self-Tipping Hywa 30 Mt Capacity, 16 Tyres For Transportingbottom Ash/Fly Ash From Dewatering Bin To Ash Dyke/Anysuitable Area For Six Months At Nkstpp /
Brick Lining Fly-ash Of Water Course At Outlet Rd 34220/r
Gem Bids For Portland Pozzolana Cement (fly Ash Based) (v3) Conforming To Is 1489 (part 1) (q2)
Sale Of Fly Ash From Mohanur Offsite On Seasonal Rate Contract
Scientific Studies To Determine Potential Of Recovery Of Minerals From Thermal Fly Ash
Gem Bids For Portland - Pozzolana Cement Fly Ash Based For Bulk Buyingas Per Is 1489 Part 1 Q2 % % % % 3 3 1 1 /oem Average Turnover Last 3 Years1 Lakh S 2 2 // 56 56 % %/years Of Past Experience Required Forsame/similar Service1 Year S 1 1 % % 9 9 /mse Exemption For Years Ofexperience And Turnoverno& % & % 1 1 % % 9 9 /startup Exemption For Years Ofexperience And Turnoverno : : & & /document Requiredfrom Sellerexperience Criteria, Past Performance, Bidderturnover, Certificate Requested In Atc, Oem Annualturnover*in Case Any Bidder Is Seeking Exemption From Experience /turnover Criteria, The Supporting Documents To Prove Hiseligibility For Exemption Must Be Uploaded For Evaluation Bythe Buyer< < > > ? ? @ @ & > & > A A > > @ @ C C? ? % % /do You Want To Showdocuments Uploaded By Bidders To Allbidders Participated In Bid?yes Documents Submitted As Part Of A Clarification Orrepresentation During The Tender/bid Process Will Also Bedisplayed To Other Participated Bidders After Log In E /bid Number: Gem/2025/b/6610474@ /dated: 26-08-2025 & & / Bid Document1 / 5 -- N N 2 2 : : E E / Minimum Number Ofbids Required To Disable Automatic Bidextension1@ >@ > E E, , 5 5 -- / / Number Of Days For Which Bidwould Be Auto--extended7 9 % 9 % /past Performance70 % R %r % @: @: @ @ /bid To Ra Enabledno 9 9 /type Of Bidtwo Packet Bid S S & U & U /time Allowed For Technicalclarifications During Technical Evaluation2 Days 6 6 N N V V 6 6 9 9 / % % A > A > ? ? /inspection Required Byempanelled Inspection Authority / Agenciespre-registered With Gemno S S V V /evaluation Methodtotal Value Wise Evaluation Y & Y & /arbitration Clauseno /mediation Clauseno //bid Details /emd Detail N /requiredno /epbg Detail N /requiredno /splitting @ / Bid Splitting Not Applied. /mii Purchase Preference /mii Purchase Preferenceno /mse Purchase Preference2 / 5 /mse Purchase Preferenceyes1. Experience Criteria: In Respect Of The Filter Applied For Experience Criteria, The Bidder Or Its Oem Of The Productoffered In The Bid Themselves Or Through Resellers Should Have Regularly, Manufactured And Supplied Same Or